-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
Mount Clive. Progress and annual reports plus final report to licence full surrender, for the period 26/8/1991 to 8/2/1995.
Exploration for possible buried diapir or diatreme - associated diamonds, copper and gold, within an intensively faulted, folded and eroded area of the northern Flinders Ranges situated 35 km east and south-east of Lyndhurst, comprised gravel, stream...-
Document
-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
RB 93/00026 Pulpara Kia Ora Bendigo bedrock drilling programme, 1992.
During the period September to December 1992, as part of the SA Exploration Initiative (SAEI), SADME completed an investigative drilling programme of concealed bedrock in the area of the Delamerian Bendigo Granite and surrounding metasediments of...-
Document
Published: 01 Jun 1993
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Orroroo and Eurelia. Progress reports for the period 24/6/80 to 19/7/82.
Intensive sampling of stream gravels, plus ground magnetic and EM surveys and core and hammer drilling (8 holes, total 473 m), were undertaken over an area of pronounced narrow aeromagnetic anomalies in the Carrieton West - Eurelia district, to...-
Document
Published: 31 Aug 1982
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Interpretation of Murray Bridge - Narrung airborne geophysical surveys, South Australia.
As part of CRAE's programme for brown coal exploration in the Murray Basin in South Australia, airborne magnetic and radiometric surveys were undertaken in the vicinity of Lakes Albert and Alexandrina by contractors Geosearch and Geoex. Various...-
Document
Published: 24 Mar 1981
-
Gilles Downs. Progress reports to licence expiry/renewal (as part of a larger area), for the period 12/3/1979 to 11/3/1981.
Ongoing diamond exploration by Stockdale over the PORT AUGUSTA 1:250,000 mapsheet area has concentrated on country to the east and south-east of Lake Gilles, where some microdiamonds and kimberlitic indicator minerals were discovered during the period...-
Document
Published: 18 Mar 1981
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 5/3/2010 to 4/3/2019.
No field work took place on EL 4231 during 2010-2011. Activities undertaken by Lymex during the reporting period have comprised reviewing all past calcrete sampling geochemical data in conjunction with continuing compilation of other relevant...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Uro Bluff [latterly with Cultana and Tregolana]. Progress reports, joint progress reports and final report to the full surrender of EL 1003 Uro Bluff, for the period 13/3/1980 to 15/1/1985.
Exploration which aimed to test the base of the Neoproterozoic Tapley Hill Formation for economic sedimentary copper deposits has included 10 rotary drillholes (total 1731.8 m), notably with a successful intersection of 1 metre of chalcocite - bearing...-
Document
-
Balta Baltana Creek. Final report at licence surrender, for the period 15/2/1983 to 15/4/1988; jointly reported with: Engenina Creek. First partial relinquishment report at licence expiry/renewal, for the period 6/4/1981 to 25/5/1988.
TARGET: Buried possible Olympic Dam - type mineralization, and massive iron ore mineralization, in the Balta Baltana Creek area; possible diamond-bearing kimberlite rocks on Engenina. EXPLORATION: Aeromagnetic surveys were flown with follow-up ground...-
Document
Published: 19 Apr 1988
-
Mount Double and Mount Ive, Gawler Ranges. Partial surrender reports for the period 17/6/1983 to 16/3/1984.
An integrated regional exploration programme, including heavy mineral sampling, air photointerpretation, multi-element analysis of sample concentrates, and aeromagnetic/radiometric survey acquisition plus data interpretation, has shown diamond...-
Document
-
Barton Siding (North). Progress reports and final report to licence expiry/full surrender, for the period 7/6/1979 to 4/1/1988.
Carpentaria's exploration for Olympic Dam - type base and precious metal mineralization included the acquisition of aerial magnetic (Geoex Pty Ltd, March 1979), helicopter-borne gravity (Layton Geophysical, September 1979) and ground magnetic surveys,...-
Document
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document
-
Interpretation of airborne geophysical data.
14 kimberlite targets were delineated, 6 meriting ground investigation. 3 are in a favourable structural setting associated with a major NNW-trending fault. Some kimberlite targets may have been missed where their signatures lie over those of the...-
Document
Published: 01 Jan 1981
-
Cultana [latterly with Uro Bluff, Tregolana and Sugarloaf Hill]. Progress reports, joint progress reports and final report to licence expiry/full surrender, for the period 20/6/1980 to 19/6/1984.
In the search for Mount Gunson type sedimentary copper, 4 deep exploratory diamond drillholes (out of 22 totalling over 5000 m) intersected subeconomic mineralisation at the target base of the Sturtian Tapley Hill Formation (best value 3 m @ 1.55% Cu...-
Document
Published: 22 Aug 1984