-
Brimpton Lake. Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 22/10/2001 to 21/10/2004.
Following the farm-in of Anglo American Exploration to this tenement in March 2003, new activity has focussed on the rapid definition of drilling targets in a search for possible Archaean basement volcanic or sediment-hosted base metal massive...-
Document
Published: 21 Oct 1904
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Sleaford. Partial surrender report for the period 13/2/1998 to March 1999.
Lag / laterite sampling and a geophysical data review of an area of concealed basement 25 km south-west of Port Lincoln, searching for granulite facies - hosted gold deposits within the Archaean Sleaford Complex, plus possible shear - related...-
Document
-
Smoky Bay. Progress and surrender reports for the period 1/5/1997 to 1/9/2000.
Exploration in an area centred on Smoky Bay, 40 km south-east of Ceduna, targeted shear - hosted mineralisation associated with granitoids of the Hiltaba and St Peter Suites. Several lineaments were identified from aeromagnetic data. Undertaking...-
Document
Published: 01 Sep 1900
-
The Western Eyre Peninsula JV Project. Data release made in lieu of submitting a first partial surrender report for EL 2662, and a final report at the surrender of EL 2711: joint annual reports for the period 26/8/1994 to 11/4/2002.
A high amplitude, linear N-S trending magnetic feature, dubbed the Coffin Bay Magnetic Anomaly, and the recognition of basement lithologies analogous to those of metallogenically prospective late Archaean terranes in Canada, were the impetus for...-
Document
Published: 17 Jun 1902
-
Minnipa. Data release made in lieu of submitting a first partial relinquishment report : annual reports for the period 7/6/1996 to 6/6/1999.
Within an area spanning the Eyre Highway between Pygery and Karcultaby, acquisition of an airborne magnetic/radiometric survey was followed by calcrete geochemical sampling. Twenty-eight aircore holes (total 1616 m) were drilled at three prospects to...-
Document
Published: 15 Nov 1999
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Ceduna. Annual reports and final report to licence full surrender, for the period 31/8/1996 to 17/7/2000.
Joint venture exploration over an area extending for 40, 35 and 50 km respectively west, north and east of Ceduna targeted Archaean and Proterozoic Yarlbrinda - style Au and Ernest Henry / Olympic Dam style Cu-Au associated with shear zones and...-
Document
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 1914
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document