-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Mount Mary. Combined first annual/final report at licence expiry/full surrender for the period 14/4/2008 to 13/4/2009.
During initial exploration of the Mount Mary area, located approximately 120 km north-east of Adelaide, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread...-
Document
Published: 14 Apr 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-05 - Netley Hill porphyry style Cu-Mo mineral prospect. Project final report.
Remodelling and re-interpretation of the geological and geophysical signatures of the Netley Hill prospect by the EL 3848 Joint Venture has indicated good potential for discovering a large porphyry copper-gold deposit at depth, beneath historical...-
Document
Published: 14 May 1908
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Data release - as updated : Goode Hill. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2002 to 28/8/2015.
Exploration of an area of Neoproterozoic metasedimentary rocks bordering, and in part intruded by, Ordovician plutons of the Anabama felsic intrusive complex, has targeted possible analogues to the Blue Rose copper-gold skarn mineralisation...-
Document
Published: 04 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Monarto (part of the Adelaide Hills Project). First partial surrender report, for the period 23/5/2013 to 22/5/2016.
28 square km, or the whole southern half, of an area centred ~14 km north-west of Murray Bridge has now been relinquished because of a recently assigned competing land usage classification that would make it difficult to do mineral exploration there....-
Document
-
Carappee Hill. Data release made in lieu of submitting a licence second partial surrender report : annual reports for the period 10/10/1995 to 16/10/2003.
Palaeoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals and granite dimension stone in an area 40 km south of Kimba. Initial calcrete sampling indicated that...-
Document
-
North Well Creek. Annual reports and final report to licence expiry/full surrender, for the period 15/11/1994 to 14/11/1999.
Exploration, initially for rare metal elements, was carried out in the vicinity of diapiric structures intruded by leucogranite in the area between Arkaroola Village and Umberatana Homestead. Work comprising petrography, rock chip sampling, stream...-
Document
Published: 07 Feb 1900
-
The Padthaway Project. Data release made at the full surrenders of four included licences: joint first annual report, for the period 16/6/1999 to 15/6/2000.
Exploration for possible economic metallic mineral products of hidden copper-gold deposit mineralising systems, which possibly were genetically related to fractionated, high crustal level emplaced Cambro-Ordovician intrusive rocks, is addressing an...-
Document
-
Weekeroo. Progress reports to licence expiry/full surrender, for the period 1/10/1970 to 30/9/1971.
A detailed examination of mineralised rock sequences within the metamorphosed Precambrian basement and Adelaidean cover rocks of the Weekeroo area, and recording of their relationship to successive deformational events and resulting rock structures,...-
Document
Published: 01 Sep 1971
-
Cocunda and Calca (Poochera Kaolin Project). Progress reports, annual reports, and final reports to licences' full surrender, for the period 12/5/1986 to 28/3/2002.
Kaolin, derived mainly from deep weathering of Hiltaba Suite granites, was the principal target of exploration in the area south and south-west from Poochera, near Streaky Bay on western Eyre Peninsula. Following a review made of historic drillhole...-
Document
-
Cutana. Annual reports and final report to licence surrender, for the period 1/8/1994 to 26/2/2002.
EL 2635, formerly EL 1976, straddled the Barrier Highway 25 km east of Olary. The licence covered ground initially taken up by MIM in late 1986, and all that company's work prior to mid 1994, with emphasis on investigating the Luxemburg - Premier...-
Document