-
Data release - as updated [made at SA Director of Mines’ discretion] : Karkarook. Combined annual and annual reports to licence expiry/renewal/full surrender, for the period 24/6/2004 to 1/9/2014.
A area centred ~ 25 km west of Cleve is being explored for possible buried economic sediment-hosted or basement unconformity - related uranium mineralisation. The tenement covers part of the Driver River and Driver River Pan which contains a...-
Document
Published: 26 Sep 1914
-
Pine Hill. Annual reports ['no work' letters] to licence expiry/full surrender, for the period 19/10/2011 to 18/10/2014.
There is no abstract created for this record-
Document
Published: 27 Oct 1914
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 1915
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release [made at SA Director of Mines' discretion] : Cummins. Annual reports for the period 13/2/2007 to 12/2/2009.
A licence comprising three sub-blocks centred ~15 km north-east of Cummins and 70 km north-northwest of Port Lincoln is being explored for a wide range of metallic minerals that may exist as economic deposits in buried basement rocks. The ground has...-
Document
Published: 24 Mar 1909
-
Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.
The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...-
Document
Published: 06 Oct 1915
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Dutton River. Annual reports for the period 4/11/2009 to 3/11/2012.
An area located in the Lincoln Uplands of eastern Eyre Peninsula, immediately west of Port Neill, is being explored for possible economic shear-hosted polymetallic gold and base metal mineralisation that may be associated with the Kalinjala Mylonite...-
Document
Published: 06 Nov 1912
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Data release - as updated : Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual reports plus final report to licence's full surrender, for the period 12/7/2009 to 13/4/2017.
No field work was conducted on the subject licence area for all of the last eight years of its tenure (period 2009-2017). During this time the licensees sought to attract needed exploration funds through inviting prospective farminees to participate...-
Document
Published: 16 May 1917
-
Barna Hill (part of the East Eyre Peninsula Project). Annual reports to licence expiry/full surrender, for the period 27/4/2011 to 26/4/2018.
An area located ~20 km east-southeast of Kimba was taken up to explore for possible buried economic base and precious metals which could be related to regional scale NW to NE lineaments and basement structural corridors that are evident from regional...-
Document
Published: 05 Jun 1918
-
Morgans (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 17/1/2012 to 16/1/2019.
37 square km or ~38% of the formerly once-reduced area of EL 4828/5933 Morgans have lately been relinquished, this block of ground covering a section of the licence located along the north-western shoreline of Lake Gilles. It has been explored mainly...-
Document
-
Mount Miccollo (part of the Wilcherry Project). Second and third partial surrender report, for the period 10/6/2011 to 27/5/2021.
An area centred ~100 km west of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now relinquished...-
Document
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Moseley Nobs (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/3/2008 to 22/11/2019.
A small area originally comprising three separate parts centred ~20 km north of Kimba on northern Eyre Peninsula has been explored for possible economic Middleback Range type stratabound BIF hosted iron ore, for shear-hosted or Menninnie Dam style...-
Document
Published: 06 Dec 1919
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document