-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
Callington. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 6/6/1978 to 24/4/1985.
The target in the Kanmantoo mine area was Cambrian stratabound lead-zinc mineralisation known to be associated with pyritic units of the Brukunga Formation, and copper associated with andalusite-staurolite-garnet-chlorite-biotite schists in the same...-
Document
Published: 28 Mar 1985
-
Keyneton. Progress reports to licence full surrender, for the period 6/8/1973 to 17/4/1974.
Continuing geological, geochemical, petrographic and ground magnetic work was done by AAP along 26 sampling profiles to try to unravel possible stratigraphic and tectonic controls on known base metal mineralisation at the Royal Keyneton and Hope mine...-
Document
-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
Copperlinka. Progress and annual reports plus final report to licence expiry/full surrender, for the period 16/4/1991 to 6/6/1997.
Exploration for possible large, potentially open cut - mineable disseminated quartz vein - type syngenetic gold and base metal deposits within a licence area located near Outalpa, 150 km south-west of Broken Hill, has comprised geological mapping,...-
Document
-
Mount Clive. Progress and annual reports plus final report to licence full surrender, for the period 26/8/1991 to 8/2/1995.
Exploration for possible buried diapir or diatreme - associated diamonds, copper and gold, within an intensively faulted, folded and eroded area of the northern Flinders Ranges situated 35 km east and south-east of Lyndhurst, comprised gravel, stream...-
Document
-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
Kanmantoo. Progress reports and final report to licence full surrender, for the period 25/4/1979 to 15/12/1984.
Exploration conducted in the Mount Pleasant - Tungkillo area included stream, soil and rock chip sampling, an airborne magnetic/radiometric survey, ground magnetic, gravity, IP and EM surveys, and drilling. These activities provided further...-
Document
Published: 21 Feb 1985
-
Emu Hill. Partial relinquishment report, June 1994.
Exploration for diamonds and base metals, 25 kilometres west of Mount Fitton, comprised an airborne magnetic-radiometric survey with heli-mag and ground follow-up, together with gravel, stream sediment, BLEG and soil sampling. Results indicated poor...-
Document
-
Archaean Metabasic Diamond Drilling Project.
The Archaean Metabasic Diamond Drilling Project was undertaken by SADME Regional Geology Branch (part of the Geological Survey of South Australia) in two locations within the north-western Gawler Craton. Metasediments in this region include banded...-
Document
-
RB 35/00021 Recovery of copper from Moonta Dumps.
The ore submitted for beneficiation consisted of borehole samples from the Handcock tailings dump at the old treatment plant at Moonta. Some 21 boreholes were systematically sunk in this dump by the Mines Department during 1951 to investigate the...-
Document
Published: 09 Feb 1955
-
RB 35/00042 Nairne pyrite milled on a pilot scale. Iron sulphides concentrated in a flotation pilot plant operated by the South Australian Department of Mines.
There is no abstract created for this record-
Document
Published: 01 Jan 1953