-
Data release [made at SA Director of Mines' discretion] : Cockabidnie. Annual reports for the period 25/5/2016 to 24/5/2019.
An area covering the northern end of the Campoona Syncline is being explored for possible economic buried graphite formed within Palaeoproterozic schistose rocks, which may exist as northern extensions to the Central Campoona graphite resource as well...-
Document
Published: 26 May 2018
-
Middlecamp Hills. First partial surrender report, for the period 30/6/2009 to 19/10/2017.
A small part, just 8 square km, of the Cleve Uplands district thought to contain outcrops of the Lower and Upper Middleback Jaspilite stratigraphic units has been explored for possible economic buried copper, gold, manganese and iron ore occurrences....-
Document
Published: 24 Oct 2017
-
ExpNotes YARDEA: Explanatory Notes YARDEA, SI 53-03.
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
Botenella Range (part of the Wilcherry Hill JV Project). Final report at licence surrender for the period 19/9/2002 to 18/9/2005.
In April 2002 the Botenella Range EL 2843 was sold by Anglogold Australasia to Aquila SA Pty Ltd, who reviewed the available data from the calcrete sampling programme, and developed a new exploration strategy for the project based on detailed gravity...-
Document
Published: 19 Dec 2005
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN, SI 53-11.
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 2003
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 2018
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 2010
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 2018
-
Data release [made at SA Director of Mines’ discretion] : Verran. Annual reports to licence expiry/renewal, for the period 4/4/1997 to 3/4/2002.
Part of the Cleve Uplands centred 15 km west of Cleve has been taken under licence to explore its potential for buried economic copper-gold mineralisation to occur within Archaean or Proterozoic basement rocks. Other possible commodities of interest...-
Document
Published: 05 Sep 2002
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 2021
-
Cockabidnie. First partial surrender report, for the period 25/5/2016 to 24/5/2018.
The central portion of EL 5791 covering 77 square km or half of the originally granted licence area has been relinquished due to its now perceived diminished prospectivity for economic graphite, cobalt or zinc mineralisation. No field work was done on...-
Document
Published: 19 Jul 2018
-
Black Eagle Rock. Annual reports and progress reports plus final report to licence full surrender, for the period 10/1/1997 to April 2001.
Four styles of mineralisation formed the basis for exploration in the Paney-Buckleboo area, namely, stratiform sedex (Broken Hill style), shear-hosted epigenetic gold and base metals (Tunkillia style), skarn-related gold and base metals (Menninnie Dam...-
Document
Published: 30 Mar 2001
-
Mount Middleback (part of the East Eyre Peninsula Project). Annual reports and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2012.
A small licence area consisting of three separate portions, located approximately 30 km west-southwest of Whyalla, has been explored for possible economic, basement granitoid intrusion - related buried IOCG and vein style uranium mineralisation, as...-
Document
Published: 14 Nov 2012
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 2008
-
Mount Messenger (lately part of the Central Eyre Peninsula Graphite Project). Annual reports plus final report to licence full surrender, for the period 27/3/2014 to 13/11/2018.
An area centred ~30 km north-west of Cowell has been explored for possible buried graphite mineralisation that might have formed within highly metamorphosed Archaean to Proterozoic bedrock sediments located adjacent to large crustal penetrating...-
Document
Published: 15 Nov 2018
-
Rudall. First partial surrender report, for the period 24/5/2012 to 2/12/2016.
Most of a small licence area located ~19 km west-northwest of Cleve has been surrendered following the completion of a helicopter-borne EM survey over the entire tenement during July 2012, looking for signs of possible buried graphite mineralisation...-
Document
Published: 24 Oct 2016
-
Eurilla Dam. Annual reports and final report to licence expiry/full surrender, for the period 16/1/1997 to 15/1/2001.
An area spanning the western margin of Lake Gilles, 50 km north-east of Kimba, was investigated for possible stratiform, shear-hosted, skarn-related and Olympic Dam - style mineralisation. Initial regional calcrete geochemical sampling returned...-
Document
Published: 29 Mar 2001
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release at the third renewal / partial relinquishment of the latter licence : progress and annual reports for the period 14/2/1989 to 30/8/2003. [Index Part 2 of 2].
Abstract continued : During January-February 1993, five traverses spaced 800 m apart of RAB drillholes put in 50 m apart (57 vertical holes for a total penetration of 2688 m) were completed at Death Adder prospect by Aberfoyle Resources to appraise...-
Document
Published: 16 Oct 2003