-
(South-eastern) Lake Torrens area. Annual reports to licence expiry/full surrender, for the period 27/7/1994 to 13/10/2000.
Features interpreted from detailed low-level infill airborne coverage to a 1995 SAEI aeromagnetic survey, flown over a large area of disturbed, mainly Adelaidean sedimentary diapiric terrain located between Hawker and the south-eastern shore of Lake...-
Document
Published: 25 Oct 1900
-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
Leighton. Annual and final reports to licence surrender for the period 19/11/2007 to 21/8/2009.
Basal Umberatana Group glacial tillitic sedimentary sequences and upper Burra Group interglacial arenaceous sediments were explored for possible economic stratabound gold mineralisation in an area located about 10-40 km north-west of Burra. In the...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Emu Dam (formerly Billeroo West). Data release in lieu of partial relinquishment upon licence renewal (as EL 2878) : annual reports for the period 4/11/1996 to 3/11/2001.
Exploration for possible economic Early Proterozoic stratabound Pb-Zn-Ag deposits of Broken Hill type, and for Olympic Dam style, Middle Proterozoic Benagerie Ridge volcanogenic sediment - hosted, epithermal / hydrothermal Cu-Au-Mo(-U) occurrences of...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-54, Bonython Hill mineral prospect. Project interim and final reports.
EL 2788 (Bonython Hill) covers 120 square km of the Broken Hill Domain, and is regarded as being prospective for Broken Hill - type (BHT) lead-zinc-silver mineralisation and for iron oxide - associated copper-gold (IOCG) deposits. As one of its PACE...-
Document
-
Mabel Creek. First partial relinquishment report at licence expiry/renewal, for the period 20/12/1999 to 19/12/2003.
The northern part of an area located approximately 80 km north-west of Coober Pedy was compulsorily relinquished on 19/12/2003 at licence renewal, due to its perceived low prospectivity. Exploration of the underlying Palaeoproterozoic /...-
Document
Published: 16 Mar 1905
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Lilydale. First annual report and final report to licence full surrender, for the period 10/3/2004 to 6/7/2005.
Exploration for possible concealed porphyry style Cu-Au deposits of a kind similar to the nearby Blue Rose prospect surface skarn occurrence was undertaken over an area of the eastern Nackara Arc, 50 km south-east of Yunta. Work comprised inspection...-
Document
Published: 06 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-06, Mingary area stratiform, Broken Hill type base metal mineral prospects. Project final report.
Historic drilling undertaken on the NSW side of the state border with SA, adjacent to EL 2820, has encountered quartz-gahnite, meta-iron formation and meta-amphibolite rock types that have been correlated with the highly base metal - prospective...-
Document
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Mount Mary. Combined first annual/final report at licence expiry/full surrender for the period 14/4/2008 to 13/4/2009.
During initial exploration of the Mount Mary area, located approximately 120 km north-east of Adelaide, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread...-
Document
Published: 14 Apr 1909
-
Mulgathing and Jumbuck areas (part of the Gawler Project Central Tenement Block). Data release at licences' joint partial surrender: project joint venture - specific annual reports for the period 1/7/2009 to 22/9/2010.
As part of the ongoing Challenger Area Joint Venture with Southern Gold intended to complete brownfields exploration near the mine and to expedite greenfields exploration of the Christie Domain for Archaean metamorphic/hydrothermal gold, work carried...-
Document
Published: 05 Jan 1911