-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
East Lake Frome, NSW. Final report on drilling programme 1976. (EL 887-896).
Fourteen stratigraphic holes were drilled in the eastern portion of the Frome Embayment in NSW.-
Document
-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Paralana Hill (part of the Poontana Uranium Joint Venture Project). Progress reports to licence expiry/renewal, for the period 19/12/1979 to 8/2/1983.
Targets of ongoing subsurface investigations in the plains area north-west of Lake Frome, now being conducted under a new joint venture, were respectively to delineate further sedimentary uranium occurrences within buried Middle and Late Tertiary...-
Document
-
Lake Frome. Progress reports to licence expiry/full surrender, for the period 18/12/1979 to 17/12/1981.
Ongoing exploration for possible Tertiary sediment-hosted roll front uranium occurrences in an area abutting western Lake Frome has consisted of the drilling of 7 open rotary holes for a total of 1384 m, to test ground midway between previously...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
RB 60/00040 Geology of the MARREE 1:250 000 map area.
The MARREE mapsheet area lies in arid country about 400 miles north of Adelaide, South Australia. It includes the town of Marree, on the Alice Springs railway line, and part of the Birdsville and Strzelecki tracks. The area is covered mainly by flat...-
Document
Published: 03 Mar 1965
-
RB 80/00026 Opal in South Australia.
Enlarged written version of a talk on the geology of opal, its occurrence and mining methods prepared for public presentation.-
Document
Published: 01 May 1980
-
RB 78/00154 Stuart Creek agate deposit.
Agate or banded chert nodules weather out of the Cambrian Andamooka Limestone over an area of several square kilometres south of the Stuart Creek Opal field. In places the agate nodules are concentrated into extensive deflation lag gravels. Banding is...-
Document
Published: 01 Jan 1978
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Moomba areas 1, 5, 9, 13 and 22 (part of the Sturt Joint Venture Project). Information status at licences' joint expiry, for the period 25/2/2008 to 24/2/2009: no work performed.
There is no abstract created for this record-
Document
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914