-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Kimba. Second partial surrender report, for the period 6/11/2006 to 5/11/2015.
112.3 square km or 29% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
Published: 07 Dec 1915
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Hall. Annual reports for the period 23/7/2013 to 22/7/2015.
An area extending inland between Baird Bay and Venus Bay, 50-80 km South-east of Streaky Bay, has been taken up to explore for significant buried occurrences kaolin associated with the deep Cenozoic weathering of Proterozoic granite, in order to...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tootla. Annual reports for the period 6/6/2009 to 13/10/2015.
During the 2009-2010 reporting year, Great Southern Kaolin Pty Ltd (GSK)'s activities comprised: - commissioning the pilot plant at the fabrication site in Kingaroy, Qld, in May-June 2010, and processing about 2 t of kaolinised granite through it to...-
Document
-
Data release [made at SA Director of Mines' discretion] : Thurlga. First annual report for the period 28/11/2014 to 27/11/2015.
A large area of the southern Gawler Ranges comprising two separate sub-blocks has been taken up to allow Menninnie Metals to conduct further regional exploration to try to delineate structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Kimba. First partial surrender report, for the period 6/11/2006 to 5/11/2013.
321 square km of the former area of EL 4938 has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’ resistance to mineral exploration....-
Document
Published: 23 Jan 1914
-
Yaninee (part of the Eyre Peninsula Uranium Joint Venture Project). Fourth partial surrender report, for the period 27/11/2001 to 12/11/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 1908
-
Data release - as updated : Kimba. Annual reports to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2018.
A large, 705 square km area surrounding Kimba township was taken up to explore for possible economic buried deposits of Mount Isa or Broken Hill style base metals (Cu-Pb-Zn-Ag), and Tanami style lode gold. The licence lay in the northern part of the...-
Document
Published: 09 Jan 1919
-
Corrobinnie (part of the Eyre Peninsula Uranium Joint Venture Project). Fourth partial surrender report, for the period 17/10/1996 to 12/11/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Cocata and Palkagee Well. Annual reports and final reports to licences' joint expiry/full surrender, for the period 1/12/2005 to 30/11/2010.
Exploration carried out over two adjacent areas located 50 to 70 km south-west and south of Wudinna was progressed under the terms of two separate joint venture agreements made by the licensee in October 2006, firstly with GE Resources (a subsidiary...-
Document
Published: 27 Jan 1911
-
Elliston. Annual reports and final report to licence surrender, for the period 31/1/2006 to 24/9/2012.
The coastal area to the north of Elliston on Eyre Peninsula was taken under licence by Afmeco Mining and Exploration (AFMEX) to explore for possible economic buried Athabasca Basin style unconformity-type uranium mineralisation that might have formed...-
Document
Published: 13 Dec 1912
-
The Eyre Peninsula Joint Venture Project [Part]. Joint final report at the surrenders of remnant areas, for the period 18/12/1995 to 14/5/2015, combined with a 5th partial surrender report for EL 5120 Corrobinnie for the period 17/10/1996 to 8/5/2015.
A total of 771.7 square km of ground from the Eyre Peninsula Project mineral exploration tenement acreage has recently been relinquished or surrendered in the case of the four subject licences. During the tenure period, the exploration strategy for...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document