Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Kimba. Second partial surrender report, for the period 6/11/2006 to 5/11/2015.
112.3 square km or 29% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
Published: 07 Dec 1915
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Gilles Downs. Annual reports to licence full surrender, for the period 15/2/2012 to 3/5/2016.
An area centred ~90 km south-west of Port Augusta has been explored for possible buried economic epithermal silver mineralisation and porphyry style Cu-Au mineralisation similar to that found recently by Investigator Resources at the Paris deposit...-
Document
Published: 01 Oct 1916
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Corunna North. Annual reports to licence expiry/full surrender, for the period 13/10/2014 to 12/10/2019.
An area located on the south-eastern edge of the Gawler Ranges, extending northwards from near Corunna Station Homestead, has been explored for possible buried economic epithermal style base and precious metal mineralisation occurrences within the...-
Document
Published: 18 Nov 1919
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [South] (part of the Mount Ive Project). First annual report, for the period 20/6/2014 to 19/6/2015.
An area centred on the southern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style mineralisation, as well as for possible...-
Document
-
Uno Range (part of the East Eyre Peninsula Project). First partial surrender report, for the period 1/8/2011 to 31/7/2018.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 05 Oct 1918
-
Data release (in part made in lieu of submitting a second partial surrender report) : Uno Range (part of the East Eyre Peninsula Project). Annual reports for the period 1/8/2011 to 31/7/2020.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 18 Dec 1920
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Gilles Downs. Combined first annual/final report at licence expiry/full surrender, for the period 23/8/2018 to 22/11/2019.
An area centred ~55 km west-northwest of Whyalla, extending between the northern shore of Lake Gilles and country to the west of Iron Baron, has been explored for possible buried economic epithermal style base and precious metal mineralisation...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [North] (part of the Mount Ive Project). Annual reports for the period 21/06/2013 to 20/06/2015.
An area centred on the northern part of Mount Ive Station and adjacent to the southern shoreline of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Mount Miccollo (part of the Wilcherry Project). Second and third partial surrender report, for the period 10/6/2011 to 27/5/2021.
An area centred ~100 km west of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now relinquished...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document