-
Cleve. Progress reports and final report to licence full surrender, for the period 27/2/1986 to 27/9/1994.
Diamond exploration undertaken near Cleve on eastern Eyre Peninsula comprised stream and loam mineralogical and geochemical sampling, the reprocessing of Pancontinental's 1979 aeromagnetic survey data, and the conduct of ground magnetic surveys and...-
Document
-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Botenella Range (part of Wilcherry Hill Project). Second partial relinquishment report for the period 14/2/91 to 18/9/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located 20 km north-east of Kimba, comprised an assessment of previously acquired soil and...-
Document
Published: 19 Nov 1904
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Lake Gilles - Uno [Range] area. Annual reports and final report to licence expiry/full surrender, for the period 11/2/2001 to 28/9/2010.
Exploration of an area abutting the northern side of Lake Gilles, and located in the vicinity of the major Uno Fault structure and the Gawler Ranges volcanic province, 70 km north-west of Whyalla, has sought to find economic epithermal/hydrothermal,...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 1910
-
2008 Uno [Range] area HyMap survey. Mineral maps Data Package.
HyVista Corporation was contracted by Mega Hindmarsh during April-May 2008 to process HyMap airborne hyperspectral scanner data acquired over the Uno Range - Lake Gilles North area of SA on 16/3/1998. The nominal pixel size acquired was 4.7 m x 4.7 m,...-
Dataset
- ZIP,
-
March 2011 Peterlumbo area HyMap survey. Mineral maps Data Package.
HyVista Corporation was contracted by PIRSA during April 2011 to process HyMap airborne hyperspectral scanner data acquired over the Peterlumbo district in the southern Gawler Ranges region of SA during March 2011. The nominal pixel size acquired was...-
Dataset
- PDF,
- ZIP
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909
-
Mount Isabella (part of WMC's Eyre Peninsula Project). Progress and final reports to licence surrender for the period 25/9/89 to 24/9/94.
Exploration for possible diamond-bearing pre-Jurassic kimberlites and for Broken Hill type stratiform base metal occurrences in the Mount Isabella area, north-east of Cummins, comprised Sirotem, ground magnetic, gravity and 2783 line km of airborne...-
Document
-
Mount Bosanquet. Progress and final reports to licence surrender for the period 12/9/86 to 23/9/94.
Exploration for possible intrusive igneous sources of diamonds and for possible Broken Hill type economic stratabound Early Proterozoic base metal deposits in the Mount Bosanquet area, 30 km south of Kimba, has comprised digital image processing and...-
Document