-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
RB 60/00043 Examination of five possible sites for water storages near Whyalla. Geological progress report, March 1965.
At the request of Mr. C. England, Assistant Engineer for Design, E. and W.S. Department, the sites for 5 alternative water storage facilities near Whyalla were examined on 17th and 18th February, 1965. On 18th February, the inspections were in company...-
Document
Published: 05 Mar 1965
-
RB 81/00099 Stuart Highway, Baker Well to Gosses section. Drilling for construction water.
13 of 38 wells were completed as production wells. Pump testing showed that 6 were capable of yielding 50 kl/day or more for 2 year period. Salinity was in excess of 10 000 mg/L TDS except near Glendambo where water from 4000 to 8000 mg/L was...-
Document
Published: 01 Jan 1982
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Pernatty Ridge. Progress reports to licence expiry/full surrender, for the period 13/12/1989 to 12/12/1991.
Possible stratabound, Kupferschiefer - style copper sulphide within the basal sediments of the early Neoproterozoic Tapley Hill Formation was the target of exploration in the Pernatty Ridge area. Aberfoyle's work has comprised a review of existing...-
Document
-
Bon Bon Homestead area. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1979 to 29/3/1980.
Testing of the stratabound base metal potential of the basal Pandurra Formation section, in an area located 40 km north-east of Kingoonya, involved drilling down into the pre-Pandurra basement with 4 vertical percussion holes totalling 878 m. This...-
Document
Published: 18 Jul 1980
-
Island Lagoon. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Basal Neoproterozoic Tapley Hill Formation - hosted stratiform copper was targeted primarily in this exploration programme, which consisted of reconnaissance deep percussion drilling (17 holes for a total advance of 4167 m) on the centres of...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
North Tent Hill (part of the Tent Hill Project). Annual reports to licence expiry/full surrender, for the period 18/1/2011 to 17/1/2013.
No work undertaken. Licence retained for two years as part of regional project acreage which was subject to unsuccessful farm-out negotiations.-
Document
Published: 14 Mar 1913
-
Koolcutta (part of the Pandurra Project). First partial surrender report, for the period 29/3/2011 to 28/3/2013.
107 square km or ~20% of the former area of EL 4708 have been relinquished because of their perceived diminished prospectivity for possible buried unconformity-related uranium mineralisation that may have formed within arenaceous sediments of the...-
Document
Published: 18 Nov 1913