-
Ediacara. Progress reports and technical reports for the period November 1962 to April 1967.
TARGET: Mississippi Valley - type stratiform lead and copper mineralisation formed near the base of the Cambrian sedimentary sequence on the Ediacara structure. EXPLORATION: Initially, in 1962, the company reviewed the progress of then occurring SADM...-
Document
Published: 12 Apr 1967
-
Mount Chambers. Progress and technical reports to licence expiry/full surrender for the period 13/9/1988 to 12/9/1989.
TARGET: Downdip extensions of known Cambrian stratabound mineralisation occurring at the Eric lead-zinc prospect, principally along a mineralised, disconformable interpreted syn-depositional palaeosurface developed within the Wilkawillina Limestone....-
Document
Published: 14 Nov 1989
-
Mount Arden. Progress reports to licence expiry for the period 1/7/1968 to 30/6/1970.
Assays of 21 geochemical samples taken from within Donnelly's iron ore deposits on Mineral Claim 4573 indicate that they have a significant anomalous trace metal content, with up to 0.25% Cu occurring in wallrocks consisting of manganiferous quartzite...-
Document
Published: 04 May 1970
-
Geology of Uro Bluff and Beda Hill area.
There is no abstract created for this record-
Document
Published: 01 Jan 1956
-
RB 2014/00002 Carbonate hosted Pb-Zn-Ag deposits. exploration using light hydrocarbons as pathfinders.
Surveys recently conducted in England, Ireland and Australia have shown that there are major spatial variations in the 'light' [molecular weight] hydrocarbon gas content of rocks which are closely related to the presence of underlying mineralisation....-
Document
Published: 01 Jul 1995
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Beltana - Aroona region. Progress reports and technical reports to licence expiry/renewal, for the period 16/7/1971 to 15/7/1972.
Continuing prospect exploration work at the Beltana zinc orebody discovery has consisted of detailed geological mapping at 1:4 800 scale, rock chip sampling of outcropping Adelaidean and Cambrian sediments, field investigation of microgravity...-
Document
-
Mount Aroona. Progress reports for the period 23/9/1968 to 22/9/1970.
Exploration for Beltana - type stratabound, hydrothermal related base metal deposits in an area situated south-west of Copley consisted of regional, ground and helicopter-assisted geological mapping at 1:4800 scale, photointerpretation of structural...-
Document
-
Report on evaluation of zinc mineralization, Third Plain, central Flinders Ranges.
There is no abstract created for this record-
Document
Published: 01 Jan 1968
-
Beltana. Progress reports to licence expiry/renewal, for the period 14/12/1973 to 13/12/1975.
A geological and geochemical appraisal made of various mines and prospects in the Beltana area has sugggested that only those situated nearest the Nuccaleena Diapir are the most likely to yield drilling success in the search for significant extensions...-
Document
-
Ediacara Mineral Field. Progress and final reports to licence surrender for the period 11/3/1968 to 14/1/1969.
A re-investigation of the remnant mineralisation potential of the Ediacara Mineral Field has involved a review of SA Department of Mines' (SADM) diamond drillhole data, the selective re-sampling of diamond drill core intervals for assay, detailed...-
Document
-
Angepena. Progress and technical reports to licence expiry/renewal for the period 18/12/1967 to 17/12/1969.
Geological and geochemical investigations undertaken in the vicinity of the historic Mucatoona copper occurrence indicate that the Angepena ?diapiric breccia zones have no potential for hosting economic mineralisation. There is only a marginal...-
Document
-
Mount McKinlay. Progress reports and final report to licence expiry/full surrender, for the period 24/2/1972 to 23/2/1973.
Possible hydrothermally - deposited native mercury metal associated with the Mount John Fault zone, perhaps in a quartz splinter vein setting similar to that of the mercury occurrence previously found nearby at the Moro mine, plus elsewhere, economic...-
Document
-
Ediacara Range. Progress and final reports to licence expiry/full surrender for the period 16/3/1973 to 15/3/1975.
Results of rotary percussion / diamond core drilling of 3 holes (total penetration 532.2 m, of which 341.2 m was cored) near the Black Eagle mine on the western margin of the Cambrian Ediacara Sub-basin, plus a reinterpretation of previous drilling...-
Document
Published: 07 Mar 1975
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document