-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
RB 93/00015 Soil Air CO2/O2 Project. Progress report 6, Olary area.
TARGET: The aim was to test if analyses of soil air and subterranean gases sampled via drill holes could define zones of known and unknown mineralisation. EXPLORATION: Soil air carbon dioxide and oxygen measurements were assessed as a guide to...-
Document
Published: 01 Feb 1993
-
Emu Dam (formerly Billeroo West). Data release in lieu of partial relinquishment upon licence renewal (as EL 2878) : annual reports for the period 4/11/1996 to 3/11/2001.
Exploration for possible economic Early Proterozoic stratabound Pb-Zn-Ag deposits of Broken Hill type, and for Olympic Dam style, Middle Proterozoic Benagerie Ridge volcanogenic sediment - hosted, epithermal / hydrothermal Cu-Au-Mo(-U) occurrences of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Strathearn, Yarramba, South Eagle and Billeroo Creek areas (part of the Strathearn Joint Venture Project). Data release in lieu of partial relinquishment at licence expiry/renewal : progress and annual reports for the period 3/5/1991 to 9/4/2000.
Exploration carried out in the South Eagle - Yarramba area, located 40-80 km north-east of Olary and 50-150 km west-northwest of Broken Hill, has targeted stratabound Pb-Zn-Ag and Cu-Au mineralisation in Proterozoic rocks of the Willyama basement....-
Document
-
Data release : Goulds Dam. Annual reports submitted until the commencement of licence joint reporting with EL 3906 Katchiwilleroo Dam, for the period 18/3/1997 to 26/8/2009.
An area located on the southern edge of the Mesozoic to Tertiary Frome Embayment, 100 km north-west of Olary, which overlies Proterozoic igneous and metamorphic basement of the Curnamona Province, is being explored primarily for possible buried...-
Document
Published: 01 Feb 1911
-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Mutooroo. Progress and final reports to licence surrender for the period 5/1/1990 to 9/12/1992.
TARGET: Lead-zinc-silver and copper-gold mineralisation in the Mutooroo area of the Willyama Inliers, 55 km east of Olary. EXPLORATION: Airborne EM surveying (~450 line km flown across strike, 75 Hz, at 300 m line spacing) with ground follow-up moving...-
Document
Published: 04 Jan 1993
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona Project (uranium exploration spinoff). Joint annual reports for the period 1/1/2009 to 31/12/2011.
During the fifth year of the Curnamona - Uranium Project JV, during the 2009 calendar year, Curnamona Energy drilled a total of 124 holes for an aggregate depth of 11,777 m on EL 4262 (including RL 123). The drilling tested “blanket sands” at Oban...-
Document
-
Olary region. Progress and annual reports for the period 23/9/1976 to 22/9/1978.
Intensive exploration of granitoid environs in the Crocker Well area has outlined new areas of, and extended known areas of, primary uranium mineralization. A regional field evaluation was also made of the Glenorchy and Plumbago areas, leading to the...-
Document
-
Trinity mine area. Progress reports to licence expiry/full surrender/re-issue over a much larger area, for the period 23/11/1976 to 22/8/1977.
Base metal exploration over an area situated south of the Barrier Highway, 25 km south-west of Cockburn, consisted of geological mapping, the searching out and sampling of gossans, ground magnetic surveying, and the drilling of 84 percussion holes...-
Document
-
Bimbowrie Hill. Progress reports to licence surrender for the period 22/10/1973 to 8/6/1976.
Exploration for possible economic stratiform, Broken Hill type base metal deposits hosted within Willyama Complex metasediments in the Bimbowrie Hill - Ameroo Hill area has consisted of a structural interpretation of aerial photos and ERTS imagery,...-
Document
-
Trinity mine area. Progress reports to licence expiry/renewal, for the period 31/8/1977 to 30/8/1979.
Ongoing exploration for Broken Hill - type mineralisation, across an enlarged licence area extending south and south-west from Cockburn to the edge of the Murraylands, consisted of intensive shallow auger/RAB bedrock drilling of geochemical and...-
Document
-
RI 029 S.A.G. Fortville No. 3 Well Completion Report
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona Project (uranium exploration spinoff). Joint annual technical reports for the period 1/1/2005 to 31/12/2011.
Exploration for possible economic buried sedimentary uranium deposits that may have formed in Tertiary palaeochannel sediments within the cover on Havilah Resources' Curnamona Craton exploration tenements has been undertaken by a subsidiary company,...-
Document
-
RB 2002/00003 Progress report on regolith mapping on the Mingary 1:100 000 map area, South Australia.
Regolith mapping over the Mingary 1:100 000 map area in the northeast of the State is in progress. To date, the Cockburn North, Cockburn South, Mutooroo North, Mutooroo South and Radium Hill South 1:25 000 maps have been completed. A well-developed...-
Document
Published: 01 Jan 2002