-
Stuart Creek. Progress reports to licence expiry/renewal, for the period 13/5/1977 to 12/5/1979.
Stratiform base metal sulphide deposits and sedimentary uranium accumulations were targeted in the Stuart Creek area, which straddles the Torrens Fault on the eastern margin of the Stuart Shelf. Two airborne magnetic and radiometric surveys totalling...-
Document
-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
RB 80/00036 Redcliff gravity survey.
Survey between Nectar Brook reservoir and Redcliff Point over the proposed Redcliff petrochemical plant indicates that a narrow valley, filled with up to 200 metres of low density sediments, occurs beneath the western portion of the site. Subsidence...-
Document
Published: 01 Jun 1980
-
RB 83/00101 Geology, geophysics and stratigraphic drilling at Depot Creek, southern Flinders Ranges.
Depot Creek is one of few localities with sedimentary contact between the Burra and Callanna Groups. The Depot Creek 1 drillhole [TD 874.35 m] provided subsurface control for making an interpretation of the structure of the eastern margin of the...-
Document
Published: 01 Jan 1983
-
RB 81/00001 Progress report on the geology of the Curdimurka region.
Geology is summarised based on literature and recent geological mapping. The Adelaidean outcrops in the Willouran Ranges where it is folded, fractured and cut by partly diapiric crush zones. The oldest Adelaidean, Callanna Beds, occurs as blocks in...-
Document
Published: 01 Jan 1981
-
RB 80/00098 Foundation geology of the Northern Power Station.
The Northern Power Station, presently under construction, is the third power station to be built at Port Augusta. Two previous stations (Playford A and B) were constructed during the 1950s, although investigations into the feasibility of using the...-
Document
Published: 01 Sep 1980
-
RB 88/00057 Torrens Hinge Zone Project - Bute region. Second and final report.
The Torrens Hinge Zone Project aimed to demonstrate the existence of prospective metalliferous rocks beneath the Cainozoic cover, to stimulate exploration and to investigate the transition between the Adelaidean sequences of the well-exposed Adelaide...-
Document
Published: 01 Aug 1988
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-64, eastern Torrens Basin / Torrens Hinge Zone, Parachilna geothermal play 2-D reflection seismic survey. Project final report.
As part of Torrens Energy' pioneering hot rock geothermal resource exploration in the central part of the Torrens Hinge Zone, a two-dimensional reflection seismic survey traverse was acquired using low-impact Vibroseis signal source equipment in the...-
Document
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Southern Hummocks Range (part of Lochiel Project). Final report at licence surrender for the period 27/8/2007 to 7/3/2008.
Investigation of an anecdotal historic ?alluvial gold occurrence located adjacent to the Lochiel - Ninnes Road has consisted of a field reconnaissance and some surface geochemical sampling (31 soil, 2 weathered metasedimentary bedrock) along a 20 m...-
Document
-
Port Augusta. Annual report to licence expiry/full surrender for the period 3/9/2004 to 2/9/2005.
An area located immediately north of Port Augusta was taken up to explore for possible economic gold, base metals and diamonds. However, continuing uncertainties concerning who were the correct holders of Native Title rights and a consequent lack of...-
Document
-
Depot Creek [part of Tasman Resources' Lake Torrens Project amalgamated expenditure / joint EL reporting agreement with PIRSA]. Final report at licence surrender for the period 24/9/99 to 23/9/2004.
Exploration for possible sediment-hosted base metals and for Olympic Dam style deposits, in an area bordering the eastern side of Lake Torrens and located approximately 48 km west of Leigh Creek, has consisted only of geophysical data reprocessing and...-
Document
Published: 18 Mar 1905
-
Nankabunyana Creek. Final report to licence surrender for the period 10/9/2001 to 19/4/2004.
Exploration for Neoproterozoic to Palaeozoic sediment-hosted base metal deposits and possible buried Olympic Dam style deposits was carried out over an area located approximately 20 km west of Copley, north of and along strike from the Ediacara Range....-
Document
Published: 23 Mar 1905
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document
-
Lake Torrens South. Data release : combined second annual / final report at licence expiry/full surrender for the period 18/1/2006 to 1/7/2009.
A planned detailed ground gravity survey across the licence area on southern Lake Torrens (780 readings to be taken at 500 m x 500 m station spacing) did not eventuate due to delays in preparing and gaining stakeholder approval for a satisfactory...-
Document
Published: 29 Sep 1909
-
Lyndhurst. Combined first annual/final report to licence expiry/cancellation, for the period 31/3/2008 to 30/3/2009.
An area located 30 km west of Lyndhurst was taken up to explore for possible hydrothermal / metasomatic copper deposits, including haematite-rich IOCG type deposits, associated with Neoproterozoic or younger diapiric intrusions emplaced into folded...-
Document
Published: 12 Nov 1909
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
Report on the AFMAG tests on northern Flinders Ranges, SA.
There is no abstract created for this record-
Document
Published: 27 Feb 1970
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document