Paralana Hill (part of the Poontana Uranium Joint Venture Project). Progress reports to licence expiry/renewal, for the period 19/12/1979 to 8/2/1983.
Targets of ongoing subsurface investigations in the plains area north-west of Lake Frome, now being conducted under a new joint venture, were respectively to delineate further sedimentary uranium occurrences within buried Middle and Late Tertiary...-
Document
-
Resistivity survey on EL 77, Lake Frome, South Australia for BP Minerals, SA.
There is no abstract created for this record-
Document
-
Gravity and magnetic survey, Hamilton Creek area, SA, April to July, 1980.
There is no abstract created for this record-
Document
Published: 01 Jan 1980
-
Yarramba. Progress reports to licence expiry/renewal, for the period 13/5/1971 to 12/5/1972.
Continuing intensive exploration for economic sedimentary uranium deposits within buried Tertiary palaeochannel sediments in the Yarramba Homestead area, 50 km north-west of Cockburn, which had been invigorated by the recent discovery of strongly...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Frome Downs and Curnamona. Respective progress reports, annual reports and JV partner's final report to licences' joint expiry/renewal, for the period 11/2/1971 to 12/2/1973.
77 rotary / diamond holes drilled by Pacminex (total 9385 m, including 196 m cored) plus another 53 holes drilled within SML 544 by joint venturer Esso (total 7029 m) indicate that a highly prospective radioactive mineralised zone occurs within...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Detailed resistivity survey on South Eagle prospect - SA. Appendix 1 in progress reports to 15/8/1974 and 14/2/1975.
In first survey (reconnaissance), 6 potential palaeochannels were outlined. 2 occur in the Low Stoney prospect. The second survey was over the projected path of the Yarramba Palaeochannel north from the Honeymoon deposit, to determine its path, shape...-
Document
-
Reconnaissance resistivity survey on Billeroo West, SA.
No new palaeochannels were located. Pathways for the Billeroo West and Curnamona palaeochannels are postulated. The depth to basement is greatest in the north and west where a sub-basin appears to occur. Deep resistivity soundings were conducted...-
Document
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Neales River (part of Lake Eyre West Project). Annual reports to licence expiry/full surrender for the period 5/12/2005 to 4/12/2007.
An area of ground located 55 km due west of the northern end of Lake Eyre North was taken up to explore for possible economic uranium mineralisation formed within either Mesozoic to Recent cover rocks or the underlying Proterozoic crystalline...-
Document
Published: 08 Jan 1908
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated : Lake Frome North (latterly part of The Lakes Uranium JV Project). Annual reports to licence expiry/full surrender, for the period 15/8/2005 to 25/11/2014.
An area on and surrounding the northern third of the Lake Frome salina was taken up to explore for possible economic buried roll front style sedimentary or calcrete-hosted uranium deposits that may have formed within Quaternary and Tertiary sediments...-
Document
Published: 01 Dec 1914
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912