RB 92/00039 Kingoonya bedrock drilling 1991.
36 reverse circulation drillholes totalling 1448 m (average depth 40.2 m) were drilled to determine the bedrock geology and geochemistry below sedimentary cover, in selected locations on the KINGOONYA 1:250,000 mapsheet area that had been recommended...-
Document
Published: 01 May 1992
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 1907
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
Moreenia. Annual reports and final report to licence full surrender, for the period 6/3/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments and soils targeted possible Thompson Belt type ultramafic-hosted nickel-copper and precious metal mineralisation that may have been intruded within a sequence of Lower Proterozoic Hutchison...-
Document
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Mount Christie. Annual reports and final report to licence full surrender, for the period 23/2/2000 to 6/8/2002.
Interest in an area near Mount Christie Siding was stimulated by the 1993 MESA Barton Bedrock Drilling Programme, which detected anomalous gold, chromium, base metals and platinoid metals in subsurface layered ultramafics. A number of targets...-
Document
Published: 20 Nov 1902
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Tumby Bay. Information status at licence full surrender, for the period 11/8/2016 to 14/12/2017 : no work performed.
There is no abstract created for this record-
Document
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 1919
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 1919
-
Ooldea. Final report at licence full surrender, for the period 2/7/2015 to 12/4/2019.
EL 5639, centred ~210 km north-west of Ceduna, was acquired by Iluka’s New Commodities team in 2015 as part of its strategy to explore for possible Voiseys Bay style magmatic nickel, copper and platinum group metallic mineralisation which might be...-
Document
Published: 29 Apr 1919
-
Wynbring. Second partial surrender report at licence expiry/renewal, for the period 23/5/2014 to 22/5/2019.
488 square km of EL 5417, located ~95 km north-west of Ceduna within the Yellabinna Regional Reserve, and extending for between 5 km and 29 km towards the south-southwest from Mount Christie Siding on the Trans Australia Railway, have been...-
Document
Published: 12 Apr 1919
-
Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2012 to 28/11/2017.
Portions of a tenement located within the Nawa Domain basement rocks subcrop region of the northern Gawler Craton have recently been relinquished by Woomera Exploration (WEX) in order to meet exploration expenditure compliance conditions of its...-
Document
Published: 08 Mar 1918
-
Nyllow Hill (near Tumby Bay). Progress and final reports for the period 2/9/88 to 1/9/90.
TARGET: Precious metals, specifically platinum group metals and gold, associated with ultrabasic intrusives and strongly faulted and altered metasediments in the Tumby Bay area. EXPLORATION: Geochemical sampling including rock chip, gravel and BCL...-
Document
-
Nyllow Hill. First partial surrender report for the period 2/9/1988 to 1/9/1989.
The licence was taken out to assess the untested potential for finding platinum group metal occurrences associated with two known ultramafic intrusive plugs outcropping in the Lincoln Uplands, 40 km north-northeast of Port Lincoln. Incidental...-
Document