-
University student thesis : Detailed geological investigation of the Burra open pit, Burra, SA.
Detailed geological and structural mapping of Samin's partly excavated new Burra open cut was performed by the author at a scale of 1:480 during the period December 1972 to end of January 1973. By the latter date the pit had been excavated downwards a...-
Document
-
Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
Williamstown. Progress and final reports to licence expiry for the period 16/12/1971 to 15/12/1972.
Exploration for possible stratiform or hydrothermal, fault-associated copper deposits in the area of basal Adelaidean metasediments lying to the north of known such mineralisation at the abandoned historic Ukaparinga mine, immediately north of...-
Document
Published: 12 Apr 1973
-
Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Orroroo. Progress reports to licence surrender for the period 18/11/1971 to 28/9/1972.
In a continuation of diamond and base metal exploration of newly discovered carbonatite / kimberlite intrusive bodies in an area located immediately north of Orroroo, these bodies were examined petrographically and analysed to compare their...-
Document
-
Anabama Hill. Progress reports and final report to licence expiry/full surrender, for the period 7/11/1980 to 6/11/1982.
In order to further test a large Delamerian granite pluton for its potential to host an economic porphyry molybdenum deposit of the Climax, Colorado type (following initial exploratory drilling and IP surveys that had been carried out by the SA...-
Document
-
Bunabie Rockhole, Hughes and Nullarbor Plain. Progress reports and final report to licences' joint full surrender, for the period 20/10/1980 to 19/10/1982.
Roxby Downs - type base metal deposits, potentially associated with linear and discrete magnetic anomalies of unknown origin in the basement, were the prime targets of exploration in an area extending between Koonalda and Hughes, adjacent to the SA/WA...-
Document
-
Mount Bayley. Progress and final reports to licence expiry/full surrender for the period 22/7/1971 to 21/7/1972.
A small area located 15 km north-east of Beltana was explored for possible economic stratabound or epigenetic/hydrothermal base metal deposits associated with Adelaidean and Cambrian calcareous/dolomitic strata and Willouran diapiric structures. Work...-
Document
-
Tarlton Knob and Cadnia Hill. Joint progress and final reports to licences' expiry/full surrender for the period 23/3/1973 to 22/3/1974.
A consultant's detailed regional geological study of the northern Willouran Ranges, and then his very close examination of the apparent controls on known diapir-related exposed epigenetic / stratabound copper mineralisation, have identified three...-
Document
-
Keyneton. Progress reports and final report to licence expiry/renewal, for the period 17/6/1972 to 16/6/1973.
During the current licence term Aquitaine conducted ongoing evaluation of its recent placer scheelite mineral discovery near Keyneton, south-east of the Barossa Ranges. Additional field reconnaissance, rock chip sampling and petrological study, much...-
Document
-
Outalpa. Progress and final reports to licence surrender for the period 8/6/1972 to 15/4/1973.
Exploration of an area located approximately 10 miles north of Manna Hill, seeking possible economic Zambian Copperbelt style stratabound copper deposits, has consisted only of an orientation geochemical survey followed by field inspection of...-
Document
-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Moonta-Wallaroo region - South Australian Exploration Initiative. Prospectivity re-assessment and GIS data package (compiled 1994-1995).
To promote renewed regional exploration of the northern Yorke Peninsula using modern techniques and concepts, MESA as part of the SAEI programme has prepared a GIS-based data package, which incorporates a study of all available drillcore and a...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Keyneton. Progress reports to licence full surrender, for the period 6/8/1973 to 17/4/1974.
Continuing geological, geochemical, petrographic and ground magnetic work was done by AAP along 26 sampling profiles to try to unravel possible stratigraphic and tectonic controls on known base metal mineralisation at the Royal Keyneton and Hope mine...-
Document
-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document