-
RB 58/00031 Geological investigation of a quartzite deposit, section 147, Hundred of Lincoln.
200,000 tonnes of ballast are required by the BHP Co. to construct a proposed tramway that will connect the calcareous sand deposits of Coffin Bay with its bulk loading installation being constructed at Proper Bay, 3 miles south-west of Port Lincoln....-
Document
Published: 10 Feb 1964
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 79/00121 Uranno microgranite deposit for road sealing aggregate and rail ballast.
A quarry plan, designed to yield 100,000 cubic m of in-situ material, has been outlined in a microgranite outcrop on Eyre Peninsula which is located 15 km east of Cummins and 10 km south-east of the Uranno railway siding. Diamond drilling (3 inclined...-
Document
Published: 01 Oct 1979
-
Lipson Cove - Tumby Bay area. Annual and final reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Geological mapping of an historically worked lamellar talc occurrence in the Tumby Bay area showed that snow white, finely flaky talc is present over a 2 km strike length within two beds of isoclinally folded schistose dolomitic limestone, but is of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Carappee Hill. First, second and third partial surrender report, for the period 1/2/2016 to 31/01/2021.
Two separate blocks together comprising 164 square km or ~10% of the former area of EL 5877 have been relinquished. No work was done on them. The ground had been taken up primarily to explore for possible economic graphite mineralisation which could...-
Document
-
Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Gilles Downs. Progress reports to licence expiry/renewal (as part of a larger area), for the period 12/3/1979 to 11/3/1981.
Ongoing diamond exploration by Stockdale over the PORT AUGUSTA 1:250,000 mapsheet area has concentrated on country to the east and south-east of Lake Gilles, where some microdiamonds and kimberlitic indicator minerals were discovered during the period...-
Document
Published: 18 Mar 1981
-
Elbow Hill. Information status at licence surrender, for the period 12/4/2013 to 29/5/2014: no work performed.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.
The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...-
Document
Published: 06 Oct 1915
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 1914
-
Rudall. Annual reports and final report to licence expiry/full surrender, for the period 24/5/2012 to 23/5/2017.
A small area centred ~ 19 km west-northwest of Cleve was taken up primarily to explore for possible economic buried graphite mineralisation that might have formed within highly metamorphosed bedrock sediments located adjacent to large crustal...-
Document
-
Mount Messenger (lately part of the Central Eyre Peninsula Graphite Project). Annual reports plus final report to licence full surrender, for the period 27/3/2014 to 13/11/2018.
An area centred ~30 km north-west of Cowell has been explored for possible buried graphite mineralisation that might have formed within highly metamorphosed Archaean to Proterozoic bedrock sediments located adjacent to large crustal penetrating...-
Document
Published: 15 Nov 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.
An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...-
Document
Published: 12 Dec 1914