-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-21 - Uranium Equities Limited, Marla Project, Proterozoic basement magnetic and gravity anomaly IOCGU targets. Drilling project final report.
Uranium Equities, the licensee parent and operator of the seven Marla Project tenements, is exploring them with the aim of discovering economic iron oxide - associated copper–gold±uranium (IOCGU) deposits, that it considers may have given rise to a...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
South-west Ooldea, Nullarbor, South Maralinga and Ifould Lake areas. [Joint] Surrender reports for the period 11/10/2002 to 28/8/2003.
Mineralisation analogous to that occurring at the giant Canadian Voisey's Bay Ni-Cu deposit, and Olympic Dam style Cu-Au mineralisation, were the conceptual targets of exploration in the Maralinga area, 40 to 80 km south and south-west from Ooldea....-
Document
-
Murloocoppie North-west (part of the Nawa Domain Project). Annual reports to licence surrender, for the period 25/6/2013 to 4/6/2015.
An area centred approximately 115 km south-east of Marla was taken up to explore for possible economic buried gold and base metal mineralisation that may have formed in Archaean to Proterozoic basement rocks or the overlying Palaeozoic sedimentary...-
Document
Published: 29 Sep 1914
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). First partial surrender report, for the period 25/6/2013 to 24/6/2015.
An area centred approximately 120 km west of Coober Pedy was taken up to explore for possible economic buried IOCG, Challenger type gold-only or MVT base metal mineralisation that may have formed in Archaean to Proterozoic basement rocks or in the...-
Document
Published: 15 Jun 1915
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 1916
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-19 - Golden Cross Operations Pty Ltd, Coober Pedy Project, G2 Lineament Corridor gravity/magnetic anomaly IOCG targets. Drilling project final report.
Golden Cross Operations Pty Ltd ('Golden Cross') commenced mineral exploration activities in South Australia with the objective of discovering significant IOCG deposits with the potential to support a major mining operation. In mid-2009, four tenement...-
Document
Published: 25 Nov 1913
-
Giddinna (part of the Gawler Craton Project). Final report at licence expiry/full surrender, for the period 28/2/2011 to 27/2/2016.
EL 4695 Giddinna, consisting of three separate small sub-blocks, was pegged as strategic acreage to provide continuity with two other pre-existing Golden Cross tenements in the Coober Pedy Group, ELs 4427/5594 Oolgelima and 4966 Stuart Range, and was...-
Document
Published: 27 Mar 1916
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Mount Barry (part of Fortescue’s North-west Olympic Project). Final report at licence expiry/full surrender, for the period 3/8/2018 to 2/8/2020.
An area centred approximately 70 km east-northeast of Coober Pedy has been explored for possible economic buried IOCG-U type mineralisation. No field work was undertaken. Activities comprised in-house background research and a historic data...-
Document
Published: 03 Oct 1920
-
Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2012 to 28/11/2017.
Portions of a tenement located within the Nawa Domain basement rocks subcrop region of the northern Gawler Craton have recently been relinquished by Woomera Exploration (WEX) in order to meet exploration expenditure compliance conditions of its...-
Document
Published: 08 Mar 1918
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Bindabu Bore. Annual and final reports to licence expiry/full surrender for the period 19/11/2007 to 18/11/2009.
Exploration for possible economic iron oxide - associated copper-gold (IOCG) deposits formed in buried Archaean to Proterozoic basement of the western Mabel Creek Ridge has consisted only of desktop prospectivity studies carried out by a consultant....-
Document
Published: 30 Apr 1910
-
Mount Gordon. Combined first annual / final report at licence surrender for the period 25/2/2008 to 5/1/2009.
A small part of a semi-regional gravity survey was acquired within the subject licence area by Eromanga Uranium, during its assessment of the IOCG mineralisation potential of a significant gravity anomaly lying on its adjoining EL 4019 Nicholson to...-
Document
-
Mount Sarah 2 area (part of the Marla Project). First partial surrender report for the period 25/1/2011 to 24/1/2013.
As part of exploration for possible buried economic IOCGU type mineralisation formed within the structurally complicated basement region lying north and north-east of Marla, a detailed ground based gravity survey was conducted for the licensee during...-
Document
Published: 02 Jul 1913