RB 63/00035 Blackwood railway cutting geological investigations, progress report no. 1, railway reserve, Hundred Adelaide - SA Railways.
A request to investigate slope stability problems in a railway cutting at Blackwood was received in a letter dated 6th May, 1965, from Mr, R. J. Bridgland, Chief Engineer, South Australian Railways, following discussions with Mr. Peed, Design...-
Document
Published: 01 Jan 1966
-
RB 73/00219 Little Para Dam proposed spillway alignment. Report on geological investigations - EWS Department.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 74/00133 Little Para Dam water treatment works quarry site and main separation pipe, Hds of Yatala and Munno Para. Report on geological conditions.
The main separation pipe alignment will traverse Units 11, 10 and 9 along the left hand side of the Little Para River. The alignment will also traverse a small tributary. The quarry will form the site for the water treatment works, 320m downstream...-
Document
Published: 01 Jan 1974
-
RB 74/00127 Report on the course printed by the AMF Inc. entitled - Workshop course in engineering site investigation, Adelaide 30 July-3 August 1973.
The lecturers introduced the participants to the fundamentals of language and communication in the field of Geotechnics. Case histories are discussed and practical problems with the aid of aerial photographs are studied. Methods of analysis of...-
Document
Published: 01 Jan 1974
-
RB 75/00027 Tea Tree Gully quarry stability investigation, north and west face.
There is no abstract created for this record-
Document
Published: 01 Jan 1975
-
RB 75/00048 Tarcoola-Alice Springs railway. Bridge sites - Robin Rise to Marla Bore, section reference 1971-8.
Safe bearing capacities and recommended footing depths for 18 minor bridge sites between Robin Rise and Marla Bore are presented in this report. Bearing capacities, in most cases presumed, range from 5 to 20 tons/ square foot (500 to 2 000 kN/m2)....-
Document
Published: 01 Jan 1975
-
RB 75/00055 Little Para Dam, main quarry slope stability analysis, section reference 1964-38.
This report supplements an earlier report; Report. Bk.No.74/133 entitled ' Little Para Dam - Water Treatment Works, Quarry Site and Main Separation Pipe, dated 20th June, 1974. The proposed quarry will initially provide rockfill for the several zones...-
Document
Published: 01 Jan 1975
-
RB 75/00051;Amdel 01050 Cemented sand screens.
There is no abstract created for this record-
Document
Published: 01 Jan 1975
-
RB 75/00080 Quartzite reserves in Engineering and Water Supply Department proposed aqueduct reservation, part sections 38 and 5394 Hd Yatala.
There is no abstract created for this record-
Document
Published: 01 Jan 1975
-
RB 73/00238 Blanche Point Banded Marl - An alternative bearing horizon beneath the city of Adelaide.
The main horizon used in the past for City buildings with piled or piered foundations has been the Hallett Cove Sandstone. It is encountered at depths of 10 to 20 m below an area including most of the City Central Business District, but has been...-
Document
Published: 01 Jan 1973
-
RB 73/00271 Barossa Dam, secn 1 Hd Barossa, geological investigation - EWS Department.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 73/00274 Little Para Dam outlet duct alignment. Report on geological investigations - Engineering and Water Supply Department.
The outlet duct alignment will traverse geological units 11, 12 and 13 along the left side embankment of the Little Para River. A geological plan and sections have been prepared and excavation and stability conditions examined. • The following...-
Document
Published: 01 Jan 1973
-
RB 75/00133 Tarcoola-Alice Springs railway. Geological investigations at bridge sites, Marla Bore, SA, to Baystone Bore, NT.
Investigations to determine safe bearing capacities and recommended rounding depths for 10 bridge sites between Marla Bore, South Australia, and Baystone Bore, Northern Territory, have been carried out. Bearing capacities, in most cases presumed,...-
Document
Published: 01 Jan 1975
-
RB 76/00008 Monarto new town. Proposed city centre. Geotechnical investigations report no. 2.
Engineering geological investigations consisting of cable tool drilling of 10 holes up to 15.25m deep, penetration testing and seismic refraction surveys were completed at the proposed CBD of the Monarto city centre. Drilling encountered thin...-
Document
Published: 02 Feb 1976
-
RB 76/00028 Little Para Dam. Report on materials testing, Hds of Yatala and Munno Para - Engineering and Water Supply Department.
This report summarises the results of all material testing covering the period from the initial investigations to date. Areas of material investigation mainly include petrographic description of rock, analyses of clays, concrete aggregate testing and...-
Document
Published: 02 Mar 1976
-
RB 76/00032 Hilton Bridge, Burbridge Road, secns Parklands, Hd Adelaide. Foundation investigations - South Australian Railways.
Three cable tool holes have been drilled to investigate the foundation conditions for a proposed new bridge over the railway line, on Burbridge Road, Hilton. Drilling disclosed a near horizontal sequence of Quaternary and Tertiary sediments which are...-
Document
Published: 11 Mar 1976
-
RB 76/00054 Engineering soils survey, Smithfield East.
The proposed subdivision is underlain by an upper horizon of expansive dark brown silty clay 0.30 to 0.60m thick, above a red-brown silty clay both units being part of the Pooraka Formation. The red-brown silty clay is recommended as a foundation...-
Document
Published: 01 Jan 1976
-
RB 76/00059 Foundation investigations, ETSA workshops, Angle Park.
The proposed workshop site is underlain by at least 30 m of stiff clay and sand of the Pooraka and Hindmarsh Clay Formations. A surface layer, up to 0.80 m thick, of fill (mostly boiler ash and cinders) overlies the clay. An allowable bearing capacity...-
Document
Published: 01 Jan 1976
-
RB 76/00107 Stratigraphy and engineering geology of the Monarto designated area - Monarto Development Commission.
Drilling of 25 cable tool holes to depth up to 20.1m in the designated area for Monarto New Town illustrates the nature, distribution and thickness of Quaternay and Tertiary sediments. The main tertiary units are the marine fossiliferous limestone of...-
Document
Published: 01 Jan 1976
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document