-
Strathearn. First partial surrender report, for the period 20/8/1986 to 17/5/1994.
Exploration for possible Broken Hill type mineralisation formed within the Bimba Formation, in an area located 70 kilometres north-west of Olary, has comprised the acquisition of ground magnetic, EM, IP and Sirotem surveys, plus the drilling of 43 RC...-
Document
-
Antro, Ameroo, Plumbago, Telechie Dam and Pimpena (the North Ltd Olary Project). Joint annual reports and final report to licences' joint surrender, for the period 12/7/1993 to 24/9/1996.
Exploration for Broken Hill style stratiform Zn-Pb-Ag and/or Roxby Downs - Cloncurry style discordant Cu-Au and Zn deposits, in the Bimbowrie - MacDonald Hill - Telechie Dam - Boolcoomata area, north-west of Olary, comprised ground magnetic and...-
Document
-
RB 98/00003 Review of the Proterozoic geology and mineral potential of the Curnamona Province in South Australia.
The Curnamona Province is exposed in the Willyama, Mt Painter and Mt Babbage Inliers, but much is obscured by younger sedimentary cover. It comprises a late Palaeoproterozoic metasedimentary and metavolcanic succession (Willyama Supergroup) with some...-
Document
Published: 02 Feb 1998
-
RB 99/00016 Wollastonite in South Australia.
Wollastonite is a calcium silicate mineral of high temperature metamorphic or igneous origins, which lately has been found to have an increasing range of industrial applications. Its main producing country is China. At Ethiudna, in South Australia's...-
Document
Published: 01 Aug 1999
-
Wompinie (part of the Drew Hill Joint Venture Project). Progress and annual reports to licence expiry/renewal, for the period 10/9/1990 to 9/9/1995.
Exploration for possible economic stratiform gold and base metals hosted by Palaeoproterozoic Willyama Supergroup metasediments and intrusive igneous rocks, undertaken within an area located to the north of the Barrier Highway and centred...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Walparuta. Progress and annual reports, and final report to licence expiry/full surrender, for the period 6/12/1994 to 20/4/2009.
Ground encompassing the Palaeoproterozoic basement Weekeroo Inlier of the Olary district, which includes the historic Walparuta copper-gold mine located approximately 20 km north of Manna Hill township, was taken out to search for possible economic...-
Document
Published: 28 Aug 1909
-
Deep Well Dam. Annual reports and final report to licence full surrender, for the period 2/9/1994 to 13/4/2003.
The Deep Well Dam area, which lies 60 km north-northwest of Olary, is located within the Palaeoproterozoic Olary Domain and encompasses rock sequences prospective for stratabound Zn-Pb and Cu-Au mineralisation. Initial work performed there comprised...-
Document
-
Geological mapping of the Outalpa Inliers, Curnamona Province, South Australia.
Previous mapping and studies on lithology and lithostratigraphy of the Willyama Supergroup have utilised disparate classification schemes and vary greatly in quality and spatial accuracy for the geological data. In this study and report, they have...-
Document
-
Mingary. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1984 to 26/2/1996.
Exploration Licence 1258 "Mingary" was granted to Mount Isa Mines Ltd in November 1984. The area, of 1185 square km lying 40 km north-east of Olary, had been the subject of exploration of the Palaeoproterozoic metasedimentary basement for Broken Hill...-
Document
-
Strathearn, Yarramba, South Eagle and Billeroo Creek areas (part of the Strathearn Joint Venture Project). Data release in lieu of partial relinquishment at licence expiry/renewal : progress and annual reports for the period 3/5/1991 to 9/4/2000.
Exploration carried out in the South Eagle - Yarramba area, located 40-80 km north-east of Olary and 50-150 km west-northwest of Broken Hill, has targeted stratabound Pb-Zn-Ag and Cu-Au mineralisation in Proterozoic rocks of the Willyama basement....-
Document
-
South Eagle. Progress and annual reports for the period 22/6/87 to 21/12/90 [i.e. to the start of the joint reporting on ELs 1352, 1382, 1412 and 1487].
Exploration for possible buried, stratiform, Palaeoproterozoic Willyama Group Ag-Pb-Zn ore deposits, over an area located 8-20 km north to north-northeast of Boolcoomata Homestead, comprised ground magnetic, Sirotem and IP surveys plus petrology,...-
Document
-
Strathearn (part of the Olary Joint Venture Project). Quarterly progress reports for the period 20/8/1986 to 19/5/1991.
Exploration for stratiform - stratabound, Broken Hill type Ag-Pb-Zn mineralisation in the buried Lower Proterozoic basement to the Strathearn area, 60 km north of Olary, comprised aeromagnetic and gravity data interpretations, ground magnetic, Sirotem...-
Document
Published: 30 May 1991
-
Kalkaroo. Annual reports plus final report to licence expiry/full surrender, for the period 11/7/1994 to 14/7/2000.
Exploration work carried out 60 km north-west of Broken Hill initially sought Olympic Dam type Fe oxide Cu-Au mineralisation associated with granitoid equivalents of the Hiltaba Suite, and subsequently, Ernest Henry style stratiform Pb-Zn-Ag...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 1910
-
Mulyungarie. Strathearn Joint Venture Project partners' first partial relinquishment report for the period 16/3/1992 to 15/9/1993.
Ongoing exploration in the Mulyungarie Station area, located 50 km north-northwest of Cockburn, which is targeting potentially economic base metal - mineralised "Bimba Formation" Early Proterozoic metasediments under shallow cover, has consisted of...-
Document
Published: 23 Dec 1993
-
Plumbago and Bimba. Progress reports, partial relinquishment reports and final report to licence full surrender, for the period 24/9/1978 to 25/1/1984.
Exploration for stratiform base metals in the Bimba Formation, and later for gold associated with banded iron formations of the Willyaman migmatitic Middle Gneiss Suite, has consisted of regional and detailed geological mapping, and mine tunnel,...-
Document
Published: 27 Jan 1984
-
Macdonald Hill. Progress reports and final report to licence expiry/full surrender, for the period 13/11/1979 to 12/11/1980.
Base metal exploration carried out over an area extending from 8 to 20 km north-northeast of Olary has consisted of a in-depth technical review of past exploration results, plus limited 1:10,000 scale geological mapping, bulk sampling of...-
Document
-
Bimbowrie Creek. Progress and final reports to licence expiry/full surrender for the period 14/2/1991 to 13/2/1993.
BHP Minerals took out a licence (in two parts) over the Bimbowrie Creek area, 25 km north-west of Olary, to search both for possible zinc-lead-silver and copper-gold deposits within inferred prospective units of the Palaeoproterozoic Willyama Complex....-
Document
-
Kalabity. Data release in lieu of partial relinquishment at licence expiry/renewal : progress reports, and successive joint venturers' final reports, for the period 6/10/1978 to 14/3/1988.
This release details exploration conducted between 1978 and 1988 for uranium, base and precious metals in the Early Proterozoic rocks of the Willyama Complex, north of Olary. Initial work on searching for uranium included airborne helicopter...-
Document