-
Orroroo. Progress reports to licence surrender for the period 18/11/1971 to 28/9/1972.
In a continuation of diamond and base metal exploration of newly discovered carbonatite / kimberlite intrusive bodies in an area located immediately north of Orroroo, these bodies were examined petrographically and analysed to compare their...-
Document
-
Mount Bayley. Progress and final reports to licence expiry/full surrender for the period 22/7/1971 to 21/7/1972.
A small area located 15 km north-east of Beltana was explored for possible economic stratabound or epigenetic/hydrothermal base metal deposits associated with Adelaidean and Cambrian calcareous/dolomitic strata and Willouran diapiric structures. Work...-
Document
-
Outalpa. Progress and final reports to licence surrender for the period 8/6/1972 to 15/4/1973.
Exploration of an area located approximately 10 miles north of Manna Hill, seeking possible economic Zambian Copperbelt style stratabound copper deposits, has consisted only of an orientation geochemical survey followed by field inspection of...-
Document
-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Keyneton. Progress reports to licence full surrender, for the period 6/8/1973 to 17/4/1974.
Continuing geological, geochemical, petrographic and ground magnetic work was done by AAP along 26 sampling profiles to try to unravel possible stratigraphic and tectonic controls on known base metal mineralisation at the Royal Keyneton and Hope mine...-
Document
-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
RB 93/00048 Review of company mineral exploration, CURNAMONA 1:250 000 sheet, South Australia.
Company exploration within the CURNAMONA 1:250 000 sheet area was reviewed by the study of data incorporated in the open file reports on 42 Special Mining Leases, 80 Exploration Licences and one group of Mining Leases dating from 1961. This data...-
Document
Published: 01 Feb 1994
-
Mount Ive. Annual and final reports to licence expiry/full surrender for the period 17/7/2006 to 16/7/2008.
Exploration for possible IOCG drilling targets within an area located 100 km north-northeast of Kyancutta, that abuts the southern shoreline of Lake Gairdner, initially involved planning for a regional gravity survey to be acquired across three of...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Eukaby. Progress and final reports to licence surrender for the period 22/6/1972 to 31/5/1973.
As part of North's continuing exploration for possible buried syngenetic, Broken Hill - type stratiform base metal deposits in the Eukaby area, extensive deep directional diamond core drilling (9 of 14 holes totalling 11,603 feet) was carried out in...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Willouran Ranges. Progress and final reports to licence expiry/full surrender for the period 11/12/1967 to 10/12/1969.
In a search for possible economic base metal mineralisation in the Willouran Ranges, a review and statistical trend surface analysis of previous company sream sediment geochemical data, combined with MIM's own orientation studies on the distribution...-
Document
-
Glenloth Goldfield. Progress reports to licence expiry/full surrender, for the period 12/1/1987 to 11/1/1989.
GLENLOTH GOLDFIELD TARGET: Gold associated with quartz veins in shears in the Glenloth Granite, which have an uncertain relationship to dolerite dykes. Possible mineralised shears or dykes within the Glenloth Granite, as indicated by NW trending...-
Document
Published: 10 Jan 1989
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Olary North. Progress reports for the period 1/8/1965 to 31/7/1967.
Reconnaissance (20.8 line km) and follow-up (66.4 line km) IP surveys, ground magnetic surveys (18.1 line km) and regional and detailed geological mapping (1:12,000 scale) were carried out. 782 semi-regional stream sediment samples, and 1038 follow-up...-
Document
Published: 14 Mar 1967
-
Freeling Heights - Mount Adams area. Progress reports for the period 10/6/1968 to 9/12/1969.
As part of a regional search for economic uranium and copper mineralisation, the US-based company Kennecott Copper in November 1968 performed a semi-detailed airborne spectrometer survey of 550 line miles in the Shamrock Valley - Freeling Heights -...-
Document