-
Lake Greenly area [Mount Hope kaolin deposit]. Progress and final reports to licence renewal for the period 30/3/1973 to 29/9/1974.
Appraisal of a newly discovered large deposit of kaolin, found in the near surface regolith to Archaean basement on two farms situated 7 km south of Mount Hope on southern Eyre Peninsula, has consisted of further air/rotary drilling (35 holes, total...-
Document
-
Alberga. Final relinquishment report for the period 24/9/1973 to March 1974.
Results of water bore sampling (7 samples) and drilling of 6 holes totalling 614 metres were disappointing. The drill holes intersected Adelaidean and Cretaceous sediments underlying Tertiary ? - Quaternary fluviatile sediments, without encountering...-
Document
-
Lake Cadibarrawirracanna. Progress and final reports to licence expiry/full surrender for the period 3/6/1980 to 2/12/1980.
Thirty-two shallow auger holes up to 2.76 m deep were drilled into the floor of Lake Cadibarrawirracanna, situated 70 km west of William Creek, in a search for possible potash-rich brines trapped by the lake sediments. The lacustrine sediments were...-
Document
-
Rudall. Progress and final reports to licence surrender for the period 10/9/1971 to 9/9/1972.
In a search for possible economic primary or secondary uranium deposits in the Rudall area, five streambed mud samples and 2 springwater samples from the Driver River drainage basin were analysed for Central Pacific Minerals by the Australian Atomic...-
Document
Published: 02 Nov 1972
-
Koonalda. Progress reports for the period 7/8/79 to 18/7/82.
Following an airborne magnetic/radiometric survey, two rotary percussion holes totalling 819 m were drilled on negative magnetic anomalies to reach pre-Mesozoic basement (gabbro and meta-sandstone) in the Koonalda area of the Nullarbor Plain. No...-
Document
-
Lake Bring. Quarterly reports, first joint annual report (with SML 710) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
TARGET: Sedimentary uranium associated with high order radiometric anomalies over lakes on the edge of the sand dune country, east of the Nullarbor Plain. EXPLORATION: Closely spaced (300-500 m), low level (65 m altitude) aerial scintillometer...-
Document
Published: 26 Jun 1973
-
Mount Willoughby, Marla, Nicholson Hill, Hope, Manya, Emu, Moorefield, Lake Meramangye, Dingo Claypan and Alinya (Officer Basin). Progress, technical and partial relinquishment reports for the period 20/8/1980 to 19/8/1985.
TRONA EXPLORATION: Of the 9 rotary/diamond holes drilled, only the first, Meramangye 1, intersected a unit equivalent to the Observatory Hill Beds, which was the target horizon for trona. Drillholes Manya nos 2-6 and Marla 7 intersected Cambrian red...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
High Bluff. Progress reports and final report to licence full surrender, for the period 9/1/1978 to 23/2/1985.
Exploration for possible Alligator Rivers (Northern Territory) style uranium deposits occurring in potential host rocks (carbonaceous pelites and carbonate rocks) within an Early Proterozoic metasedimentary sequence underlying a Middle Proterozoic...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Lake Dey Dey, Lake Maurice, Ooldea Range, Waldana, Lake Maurice West, Leemurra, Punthanna, Yadina and Lake Maurice East. Joint progress reports and final report to licences' joint expiry/full surrender, for the period 25/4/1979 to 15/11/1982.
The exploration concept was based on searching for secondary uranium mineralisation that might be derived from the Musgrave Block basement rocks and that could have become precipitated within calcrete horizons from ponded uraniferous surface drainage...-
Document
-
Woomera, Emmie Bluff, Salt Creek, Portulacca Ridge and Red Lake. Progress reports for the period 21/8/1979 to June 1983.
Continuing exploration in the Woomera area has included the acquisition of a ground magnetic and gravity survey over the Buller Dam anomaly, which lies on the western flank of the Acropolis aeromagnetic anomaly, and this work confirmed that the former...-
Document
-
Radium analyses of waters from Lake Maurice, SA. Lead isotope analyses of waters from Lake Maurice, SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1982
-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Comprehensive waste management plan for metropolitan Adelaide. Report to the South Australian Waste Management Commission.
Evaluates short and long term options for the collection, transport, treatment, recovery of resources and final disposal of solid and liquid wastes.-
Document
Published: 01 Jan 1982
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document