-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Haggard Hill, Whymlet Well, Bon Bon Outstation, McDouall Peak and Phar Lap Outstation (the Kingoonya Project). Joint annual reports and final report to licences' surrender, for the period 21/6/2006 to 9/4/2010.
Exploration of a 4600 square km project area comprising five licences in two contiguous groups within the Kingoonya region has targeted two distinct styles of uranium mineralisation. The primary focus was on possible sandstone - hosted deposits within...-
Document
Published: 16 Apr 1910
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 1917
-
Painted Hill. Progress reports and final report to licence expiry/full surrender, for the period 12/7/1982 to 11/7/1987.
Stockdale's diamond exploration work included reconnaissance stream sampling, and photogeology and Landsat interpretation. Ground magnetic surveys were run over aeromagnetic anomalies interpreted from the previous nickel exploration (Mount Purvis)...-
Document
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document
-
Nilpinna Springs. [Farminee's diamond exploration] Progress report for the period 13/7/1986 to 12/1/1987.
TARGET: Diamondiferous kimberlites in the Boorthanna Trough region (near Nilpinna Springs). EXPLORATION: A literature review, the reprocessing and re-interpretation of data from BHP's 1983 Peake Creek Aerial Magnetic Survey flown by Aerodata /...-
Document
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
Engenina Creek. Second partial surrender report, for the period 6/4/1981 to 23/6/1990.
TARGET: Kimberlitic diatremes; Olympic Dam / Tennant Creek style deposits; stratiform base metal deposits; iron ore; Cretaceous sediment - hosted uranium deposits. EXPLORATION: Regional : aerial magnetic and radiometric surveys, geological mapping,...-
Document
Published: 14 Aug 1990
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Nilpinna Homestead area (part of the Australian Diamond Exploration joint venture). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 22/2/1987.
Diamond exploration undertaken in the Peake and Denison Ranges included the acquisition and processing of aerial magnetic, radiometric and heliborne magnetic and VLF-EM surveys, with follow-up ground magnetic and Sirotem surveys, plus extensive...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Anna Creek. Progress and final reports for the period 23/9/83 to 22/9/88.
TARGET: Diamonds in the William Creek area, and areas south-east of the Peake and Denison Ranges. EXPLORATION: Regional stream sediment and loam sampling supported by geological mapping and ground magnetic surveys located 2 areas rich in kimberlitic...-
Document