-
EL 272 Hamilton Creek. A regional assessment of the base metal potential of the Parabarana (to) Gunsight trend, and Callanna Beds (through) Yudnamutana sequence, northern Mount Painter Province, South Australia.
Aquitaine Australia Minerals Pty Ltd (Aquitaine) entered into a joint venture with North Flinders Mines on 21 August 1975, over an area defined by Exploration Licence 272 (ex EL 153). The area included two main prospective zones for copper deposits:...-
Document
-
Report on the Shamrock uranium prospect.
Uranium mineralisation was first discovered at the old Shamrock Copper Mine during a systematic search of old mine dumps by the South Australian Department of Mines in 1955. Follow-up investigations located a small high-grade uranium lode (Valley...-
Document
-
Willouran Ranges Stratiform Copper Project. Quarterly, annual and surrender reports for the period 4/4/79 to 19/7/83.
An ongoing work programme has included the latter stages of: the drilling of over 180 percussion and diamond holes totalling 24,388 m, the collection and assaying of 35,000 geochemical samples, preparation of 1150 petrographic descriptions, and...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola (part of the Frome Basin Project). Annual reports for the period 3/6/1996 to 4/12/2008. [ Index Part 1 of 2 ].
A 1243 square km rugged mountainous area in the far northern Flinders Ranges extending between Arkaroola, Moolawatana, Prospect Hill, Mount Livingston and Mount Saturday was taken up to explore primarily for gold that it was hoped could exist in...-
Document
-
Yarley. Annual reports to licence expiry/full surrender, for the period 19/8/2009 to 18/8/2012.
A small area located on the southern Lake Torrens Plains immediately west of the ABC Range was taken up to allow evaluation of its potential for having buried economic sedimentary coal and/or uranium mineralisation occurrences. There are no...-
Document
Published: 02 Sep 1912
-
Copley and Wearing Gorge areas. Joint annual reports to licences' surrender, for the period 18/6/2007 to 1/11/2011.
Several small areas in the vicinity of the Mount Coffin Diapir, which covers ~5 square km within the north-central Flinders Ranges immediately to the south-east of Copley, have been explored with the hope of finding additional copper resources near...-
Document
Published: 05 Sep 1911
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf and Andamooka Opalfields (the Stuart Shelf Joint Venture Project) . Progress reports to licences' expiry/renewal, for the period 16/1/1981 to 16/6/1986. [ Index Part 1 of 3 ].
The continuation of copper-gold exploration across the Stuart Shelf region, as part of a newly indentured joint venture project involving Western Mining Corp. (WMC) and British Petroleum (BP), has remained based on the acquisition of detailed ground...-
Document
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Port Pirie. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.
Concerted exploration for possible stratiform Mount Gunson type or epithermal Olympic Dam type base metal deposits, on the south-eastern edge of the Stuart Shelf near Port Pirie, was begun by North Broken Hill Ltd in response to the public release by...-
Document
-
Moolawatana. Quarterly and final reports for the period 26/8/75 to 25/8/76.
Ongoing copper/uranium exploration of basement and Willouran cover southwest of Moolawatana comprised ground magnetic, IP, EM and TEM surveys, airborne EM (Turair) and magnetic surveys, prospect-scale geochemical surveys and limited diamond drilling...-
Document
Published: 01 Nov 1977
-
Mount McCallum, Mount Morris and Mount Roebuck (part of Flinders Ranges Project). Combined first annual report, plus progress and final reports to licences' expiry/full surrender, for the period 23/5/2005 to 22/5/2008.
Neoproterozoic glacial sedimentary units in the intramontane basinal valley located east of Leigh Creek and Copley, which were considered likely to contain possible geologically suitable palaeo-depositional sites for secondary uranium mineralisation...-
Document
Published: 16 Jun 1908
-
Bob Nob prospect, Mount Painter district. Progress and final reports to claim option relinquishment, for the period 2/6/1968 to 1/10/1969.
Investigation of reported radiometric anomalies associated with sub-economic iron mineralisation at the Bob Nob prospect, which is situated approximately 8 miles north-west of Arkaroola Homestead, has comprised ground magnetics and scintillometry with...-
Document
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document
-
Finniss Springs. Progress reports for the period 27/5/80 to 26/1/83.
Base metal exploration carried out 70 km west and south-west of Marree, to investigate the potential for Olympic Dam - type mineralisation in concealed pre-Adelaidean rocks, has included geochemical rock chip and water sampling, an aerial radiometric...-
Document
Published: 21 Feb 1983
-
Mount Painter area (Yudnamutana Mining Field and Shamrock Valley). Progress and final relinquishment reports for the period 1/10/1968 to 31/3/1970.
Kennecott took up 3 SMLs in the Mount Painter district during 1968 to evaluate known copper-uranium occurrences and to search for new occurrences. At the same time, they secured the ground surrounding four 40-acre Mineral Claims already in their...-
Document
-
Bourne. Final report at licence expiry/full surrender for the period 15/7/1968 to 14/7/1969.
A possible association between copper and uranium mineralisation such as had been reported in the early 1950s at the Nicholl's Nob mine, located just to the east of the subject licence, was pursued by E-Z, who in this case examined the western...-
Document
-
Paralana. Progress and final reports to licence surrender for the period 16/5/1966 to 15/12/1966.
Regional stream sediment sampling conducted over an area of historically prospective ?Archaean, Proterozoic and Palaeozoic rocks in the Mount Painter - Mount Babbage - Mount Livingstone - Yudnamutana area did not reveal any base or precious metal...-
Document
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document