-
Arkaroola. Progress and technical reports to licence renewal for the period 19/5/1972 to 18/5/1974.
Ongoing base metal exploration in the Arkaroola Station region of the north-eastern Flinders Ranges by licensee North Flinders Mines (NFM) has involved reviews of certain existing prospects, which has led to the entry of farminee Shell Minerals...-
Document
-
RB 88/00076 Summary review of lead-zinc mineralization in South Australia.
266 summary sheets on significant lead-zinc occurrences and anomalous concentrations have been prepared by the Department's Lead-Zinc Taskforce as a data package, in the form of 5 reports, to assist in the search for lead-zinc deposits to provide...-
Document
Published: 01 Aug 1988
-
Data release [made at SA Director of Mines' discretion] : Clare (part of the Spalding Project). Annual reports for the period 2/1/2007 to 1/1/2010.
In Phoenix Copper's opinion, although several previous explorers had investigated the Spalding Inlier area, many targets remained insufficiently tested. The principal structural target the company wished to explore is the intersection between an...-
Document
-
Mount Craig Copper Project. Final report for June to December 2021 geophysical and drilling program, Project ADI RD02-268 [part of Accelerated Discovery Initiative Round 2, 2021].
An area centred ~28 km east of Hawker is being explored for possible buried epigenetic/hydrothermal, skarn style and sediment-hosted stratabound base and precious metals mineralisation that may have formed within prepared Adelaidean metasedimentary...-
Document
Published: 02 Nov 1921
-
Port Augusta - Wilkatana area. Progress reports and final report to licence expiry/full surrender, for the period 30/10/1969 to 4/8/1972.
An area surrounding the Emeroo Range, and extending from the vicinity of Port Augusta to 30 km west of Hawker, was explored by Utah for possible economic stratabound base metal deposits which it was thought could be associated with certain favourable...-
Document
-
Eurelia - Carrieton area. Annual and progress reports to licence amalgamation/renewal for the period 5/8/1971 to 14/2/1972.
Ongoing exploration for possible economic stratiform copper deposits occurring in Late Proterozoic metasediments forming the Eurelia Anticline has concentrated on evaluating mainly the Copper Claim prospect plus four less attractive prospects, after...-
Document
-
RB 65/00035 Clare Regional Geochemical Project.
This investigation was a feasibility study, therefore environmental factors are dealt with in much more detail than would be necessary in a routine geochemical report. Apparently these factors has little significant effect on the results. Spot...-
Document
Published: 01 Jan 1967
-
RB 76/00049 Geochemical exploration of the Gawler 1:63 360 sheet. Completion report.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
Mount Bryan. Annual report and final report to licence full surrender, for the period 21/1/2008 to 7/5/2012.
Exploration for gold and copper mineralisation within an area located immediately south of Mount Bryan and 19 km north of Burra was aimed principally at finding deposits of copper oxide and carbonate ores similar to those mined historically at Burra...-
Document
-
Myrtle Springs (part of the Flinders Ranges Project). First partial surrender report for the period 2/4/2003 to 15/12/2009.
The only exploration field work completed by JV operator Perilya on the relinquished subareas of the tenement was a review made during 2008 of the magnesite potential of the licence, along with that of EL 3111 (now EL 4211) located adjacent to the...-
Document
Published: 28 Sep 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Cone (subsequently part of the Burra North Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 6/3/2007 to 5/3/2009.
An area of 300 square km located immediately north and north-east of Burra was taken up because it is considered to be prospective for gold and copper mineralisation related to Cambro-Ordovician sediments and late-stage felsic and mafic intrusives,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Burra Hill (part of the Burra South Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 1/5/2006 to 30/4/2009.
Within a small licence area centred about 15 km south-south-east of Burra township in the northern Mount Lofty Ranges, Copper Range initially targeted near-surface copper oxide mineralisation associated with an altered and brecciated contact zone...-
Document
-
Mount Parry (part of the Flinders Ranges Project). Fifth partial surrender report, for the period 4/1/1999 to 24/12/2013.
A 47.4 square km area, representing about 37% of EL 4358, has been relinquished due to the inferred significant cover there of Quaternary alluvial and aeolian overburden. No field work was conducted on this area as part of a regional search for...-
Document
Published: 12 May 1914
-
Mount Parry (part of the Flinders Ranges Project). Sixth partial surrender report, for the period 4/1/1999 to 2/6/2015.
EL 5520 is being explored as part of a regional search for possible economic Beltana-style zinc silicate hydrothermal replacement mineralisation hosted by brecciated Cambrian or Neoproterozoic bedrock carbonates. No field work was completed by licence...-
Document
Published: 11 Dec 1915
-
Data release [made at SA Director of Mines' discretion] : Bald Hill North. Annual reports for the period 25/7/2006 to 24/7/2009.
A small area centred ~5 km west of Burra township is being explored for possible buried economic, Monster mine type stratiform copper oxide or copper carbonate deposits, thought to be associated with poorly exposed fault structures and related...-
Document
-
Hallett. Progress reports and final report to licence full surrender, for the period 24/10/1978 to 11/2/1982.
Percussion drilling (17 inclined or vertical holes totalling 1287 m) and resistivity surveys were undertaken by Seltrust Mining over an area lying immediately to the north-northwest of Burra, in a search for possible structurally controlled copper...-
Document
Published: 07 Apr 1982
-
South of Burra area. Progress reports and final report to licence full surrender, for the period 1/6/1964 to 25/2/1966.
Exploration reconnaissance work has been carried out over many old copper mines and prospects situated within a 172 square mile area located south of the town of Burra [the impetus being that recently the South Australian Department of Mines had...-
Document
Published: 25 Feb 1966
-
Mount Lyndhurst (part of Perilya's Flinders Ranges Project). Annual and final reports to licence surrender for the period 13/12/1999 to 7/7/2004.
Numerous base metal occurrences and historic mines occur in the Mt Lyndhurst area, hosted mainly in Neoproterozoic rocks of the Adelaide Geosyncline. Investigations at several prospects have included detailed mapping plus soil and rock chip sampling....-
Document
-
Arkaroola. Progress reports for the period 26/8/1974 to 9/8/1977.
A sequence of exploration programs in the Mount Painter Province, undertaken on Special Mining Leases since 1965, have been previously released. Exploration for base metals since 1974, in an area extending 20 km southwest from Arkaroola, comprised a...-
Document
Published: 01 Nov 1977
-
Wooltana. Progress reports and final report to licence full surrender, for the period 19/5/1969 to February 1971.
TARGET: Disseminated low grade, large tonnage deposits of copper, lead and zinc mineralisation formed in Adelaidean metasediments overlying Mesoproterozoic igneous rocks. EXPLORATION: 1:12,000 and 1:4,800 scale geological mapping, rock chip, soil and...-
Document