-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Lilydale, SA. Progress report and final report to licence expiry/full surrender, for the period 1/4/1969 to 31/3/1971.
An airborne scintillometer reconnaissance with ground-based follow-up, a geochemical study of groundwater, and open-hole rotary mud drilling (10 vertical holes, total 3205 feet) plus downhole wireline geophysical logging failed to locate significant...-
Document
-
Armonda Homestead. Progress reports and final report to licence full surrender, for the period 6/10/1980 to 16/12/1983.
A subcropping Tertiary sub-basin located about 20 km east of Burra has been investigated by CRAE for possible economic buried sedimentary occurrences of coal, uranium and deep lead alluvial gold. During July 1980, gravity traverses totalling 18 line...-
Document
Published: 28 Oct 1983
-
Jones Dam [Mutooroo Station]. Progress reports to licence expiry/full surrender, for the period 4/1/1979 to 3/1/1981.
81 closely-spaced rotary mud vertical open drillholes (total penetration 9218 m) evaluated known low grade palaeochannel uranium mineralisation previously detected in Miocene sand sequences adjacent to the Anabama - Redan Fault by Tricentrol Australia...-
Document
-
Pine Valley. First progress/final report at licence surrender for the period 29/4/1971 to 8/7/1971.
Exploration of the Tertiary sediments on the north-western margin of the Murray Basin was undertaken as part of a regional search for possible economic sedimentary uranium deposits which might be derived from the outcropping Willyaman primary uranium...-
Document
-
Milang. First partial relinquishment report at licence expiry/renewal, for the period 13/11/1979 to 21/2/1985.
Within the now relinquished portion of the licence area, four gravity traverses totalling 34.4 line km and 11 rotary mud drillholes for 593.2 m were completed by CRA in a search for possible sedimentary roll-front type uranium deposits formed within...-
Document
Published: 15 Apr 1985
-
Kakoonie, Bungunnia, Redcliffe, Armonda, Mongolata. Interpretation of 1980 - flown airborne geophysical surveys in the Florieton district.
A belt of complex magnetic zones trending N-S corresponds in part to outcropping or drilled granites. Other zones in the belt reflect either iron rich sediments within synclinal basins, or further igneous intrusive bodies, or both. The belt may...-
Document
-
Postmark. Progress and final reports to licence expiry/full surrender for the period 7/5/1970 to 5/5/1972.
Exploration for possible economic sedimentary uranium deposits in the Postmark area on the northern margin of the Murray Basin in South Australia comprised two airborne radiometric and scintillometric surveys together totalling approximately 1350...-
Document
-
Sturt Vale. Progress reports and final report to licence expiry/full surrender, for the period 25/4/1979 to 24/4/1980.
Continued uranium exploration in this area of the northern Murray Basin was aimed at following up anomalous radioactivity encountered during previous work, and further delineating the nature of the Tertiary sand development and associated uranium...-
Document
Published: 07 May 1980
-
Quondong. Progress reports and final report to licence expiry/full surrender, for the period 16/2/1979 to 15/2/1980. s and final reports to licence expiry for the period 16/2/1979 to 15/2/1980.
An open hole rotary mud drilling programme of 42 holes for 4939 m was used to evaluate the licence area for economic Tertiary fluvial sandstone - type uranium mineralisation, after previous and current explorers had identified buried uraniferous...-
Document
-
RB 74/00198 Mount Mary resistivity survey.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Coonalpyn. First partial surrender report, for the period 6/8/2007 to 5/8/2009.
For an area located in the southern Delamerian Fold Belt, and extending for ~50 km parallel to the Princes Highway north and north-west of Coonalpyn and Coomandook, a consultant's desktop interpretation of ASTER 2000, ASTER NTIR, DEM Raster and...-
Document
-
Coonalpyn. Annual reports and final report to licence expiry/full surrender, for the period 6/8/2007 to 5/8/2010.
An area located in the southern Delamerian Fold Belt, and extending for ~50 km parallel to the Princes Highway north and north-west of Coonalpyn and Coomandook, has been explored for possible economic basement-hosted uranium and base metal skarn...-
Document
-
RB 2003/00013 North-western Murray Basin geological synthesis, South Australia.
The Murray Basin is an intracratonic basin filled with Cainozoic fluvial to shallow marine sediments. Deposition in the Eocene and early Oligocene was characterised by floodplain and swamp deposits, emplaced with occasional interbeds of shelly clays...-
Document
Published: 01 Aug 2003
-
West Creek (part of the Mutooroo Project). Progress reports to licence expiry/full surrender, for the period 13/11/1979 to 12/11/1981.
As part of regional exploration for possible economic sedimentary uranium deposits which might have formed along the northern margin of the Murray Basin, adjacent to a probable exposed basement source area at Radium Hill, a 12 hole, 1337 m open-hole...-
Document
-
Lignum Dam. Progress reports plus final report to licence full surrender, for the period 7/1/1974 to 27/5/1975.
As follow-up to a programme of uranium exploration lately carried out in its adjoining EL 63, Tricentrol chose to drill an additional area of prospective Tertiary Murray Basin sediments present in the vicinity of the Anabama Fault zone, to further its...-
Document
Published: 07 May 1975
-
Coonalpyn, Salt Creek and Keith (the Coorong Project). [Final] Progress report to licence expiry/full surrender, for the period 27/4/1972 to 26/10/1972.
In follow-up to previous exploratory drilling carried out on Pacminex' SMLs 649 and 650, another 15 open rotary mud precollared /diamond cored tail vertical drillholes with a total penetration of 3616 feet (including 137 feet of coring) were drilled...-
Document
-
Coonalpyn (part of the Coorong Project). Progress reports for the period 8/12/1971 to 7/6/1972.
An area of SA's Upper South-East located inland just to the east of the Coorong is being explored for possible buried, sediment-hosted secondary uranium mineralisation that may occur near the base of the cover adjacent to known radioactive granite...-
Document
-
Mutooroo. Progress reports and final report to licence expiry/full surrender, for the period 4/5/1973 to 3/5/1975.
In a search for possible buried sedimentary uranium mineralisation which may have been precipitated adjacent to the northern margin of the Murray Basin in SA, following long term palaeodrainage transport of the dissolved weathering products of primary...-
Document