-
Port Augusta. Annual report to licence expiry/full surrender for the period 3/9/2004 to 2/9/2005.
An area located immediately north of Port Augusta was taken up to explore for possible economic gold, base metals and diamonds. However, continuing uncertainties concerning who were the correct holders of Native Title rights and a consequent lack of...-
Document
-
Olympic Dam Project - Hydrogeology of the Olympic Dam mine site.
There is no abstract created for this record-
Document
Published: 07 Sep 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Uro Bluff [latterly with Cultana and Tregolana]. Progress reports, joint progress reports and final report to the full surrender of EL 1003 Uro Bluff, for the period 13/3/1980 to 15/1/1985.
Exploration which aimed to test the base of the Neoproterozoic Tapley Hill Formation for economic sedimentary copper deposits has included 10 rotary drillholes (total 1731.8 m), notably with a successful intersection of 1 metre of chalcocite - bearing...-
Document
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Pandurra. Progress reports to licence expiry/renewal, for the period 23/3/1973 to 22/3/1975.
Regional exploration for Mount Gunson type stratabound copper mineralisation over an area extending from Whyalla to near Lake Torrens comprised geological mapping, rock chip geochemical sampling, and the drilling of 157 rotary stratigraphic holes...-
Document
-
Mount Gunson district. Geological mapping data, 1971-1972.
A mapping programme was undertaken by the licensees to test the possibility of the near-mine area to Mount Gunson being a suitable host environment for stratiform copper mineralisation. The exploration hypothesis used was that such mineralisation...-
Document
Published: 21 Apr 1972
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Jenner Hill. First partial surrender report at licence expiry/renewal, for the period 4/10/1989 to 3/10/1992.
Possible Mesoproterozoic stratabound unconformity - related copper mineralisation of Mount Gunson / Cattlegrid type, and, after 1980, pre-Pandurra Formation stratigraphic level, basement - hosted, Olympic Dam style iron oxide associated...-
Document
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Point Paterson - Port Pirie area. Progress, technical and final reports for the period 22/1/1970 to 10/12/1971.
Reports on the investigation of potential northern Spencer Gulf coastal sites for the solar evaporative production of seawater salt, principally as a feedstock for the proposed petrochemical plant which was being considered by Dow Chemical Corp. for...-
Document
Published: 10 Dec 1971
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Lake Hart. Progress reports and final report to licence full surrender, for the period 23/3/1977 to 3/2/1978.
Exploration for possible Precambrian sediment-hosted base metal deposits within an area lying just west and south of Lake Hart has comprised a photogeological study, geological mapping at 1:87,000 scale, a gravity survey along a single 30 km traverse,...-
Document
-
Tregalana - Sugarloaf Hill area. Progress reports to licence expiry/renewal, for the period 21/6/1976 to 20/6/1978.
Vertical percussion drilling (4 holes totalling 577 m) and diamond drilling (3 holes totalling 538.4 m) undertaken in the Tregalana and Sugarloaf Hill areas of the Stuart Shelf disclosed weak base metal mineralisation (0.05-0.65% Cu spread unevenly...-
Document
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
RB 66/00108 Port Augusta-Whyalla railway, Spencer Gulf crossing. Geological investigations, progress report no. 1, feasibility stage, Hds Davenport and Copley.
It is proposed to construct a railway crossing of Spencer Gulf and its tidal flats, two miles north of Port Augusta. Geological investigations, mainly surface mapping and cable tool drilling, have shown 140ft of sediments of Tertiary to Recent age in...-
Document
Published: 01 Jan 1968
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
RB 2009/00022 Stuart Shelf geochemical project.
The Carrapateena mineral discovery was the outcome of a PACE Initiative drilling project co-funded by RMG Services Pty Ltd and the Government of South Australia. Two holes were drilled, the second of which (CAR002) encountered a major body of...-
Document
Published: 01 Dec 2009