Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Antro, Ameroo, Plumbago, Telechie Dam and Pimpena (the North Ltd Olary Project). Joint annual reports and final report to licences' joint surrender, for the period 12/7/1993 to 24/9/1996.
Exploration for Broken Hill style stratiform Zn-Pb-Ag and/or Roxby Downs - Cloncurry style discordant Cu-Au and Zn deposits, in the Bimbowrie - MacDonald Hill - Telechie Dam - Boolcoomata area, north-west of Olary, comprised ground magnetic and...-
Document
-
Morialpa. Progress, annual and final reports to licence expiry/full surrender for the period 9/2/2003 to 8/2/2006.
Subsequent to a partial relinquishment of ground and related data release made in August 2003, ongoing exploration conducted over a small area located about 25 km north-northwest of Manna Hill township, looking for possible Zambian type stratiform...-
Document
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release - as updated : Mongolata. Annual reports plus final report to licence expiry/renewal, for the period 13/2/2004 to 12/2/2009.
An area centred ~15 km east-northeast of Burra has been explored for possible economic buried porphyry style copper-gold deposits, initially by grant licensee Bonanza Gold Pty Ltd during the first year of tenure, and thereafter for the next three...-
Document
-
Manunda, Tiverton Outstation, Iron Peak and Pualco Range (the Razorback Ridge Iron Ore Project, later the Mawson Iron Project). Joint annual reports for the period 10/12/2009 to 9/12/2016.
Three adjoining licence areas in the Baratta Trough within the northern Nackara Arc have been taken up to explore for possible economic buried Neoproterozoic metasedimentary semi-stratabound iron ore. Central EL 4267 covers ~3 km strike length of the...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Waukaringa. Progress and final reports to licence surrender for the period 9/6/1987 to 5/10/1988.
TARGET: Stratabound gold in prospective areas of Adelaidean sedimentary outcrop peripheral to the Waukaringa Goldfield. EXPLORATION: After undertaking a literature review and assessment of previous exploration results, plus a regional geophysical...-
Document
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Blinman, Maggie Hill and Martins Well. Quarterly, six-monthly, annual and technical reports for the period 19/12/1989 to 8/9/1999.
PEL 41 was granted to a deliberately SA-based new venture exploration company consisting of Chairman and well-known Emeritus Professor of Geology Eric Rudd, four other founding honorary and unsalaried directors, and 100 or so individual speculative...-
Document
-
Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.
TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...-
Document
-
Furlough Dam. Progress reports for the period 28/7/80 to 27/4/81.
Results of the deep stratigraphic / mineral exploratory well MU-2 drilled near Mulyungarie Homestead, east of Lake Frome and adjacent to the SA/NSW State border, are presented, besides the interpretation of a gravity survey conducted earlier in the...-
Document
Published: 17 Nov 1981
-
Mount Bryan. Annual report and final report to licence full surrender, for the period 21/1/2008 to 7/5/2012.
Exploration for gold and copper mineralisation within an area located immediately south of Mount Bryan and 19 km north of Burra was aimed principally at finding deposits of copper oxide and carbonate ores similar to those mined historically at Burra...-
Document
-
Truro. Progress reports to licence expiry/full surrender, for the period 15/7/1991 to 29/10/1997.
Gold, base metal and diamond exploration carried out over a small area located immediately south-east of Truro has comprised detailed BLEG stream sediment sampling across the licence, limited rock chip geochemical sampling of quartz veins, alluvium...-
Document
Published: 15 Apr 1998
-
Spalding. Final report at licence full surrender, for the period 4/11/2009 to 7/5/2012.
Exploration for copper mineralisation within a small licence area surrounding Mount Tinline, located approximately 20 km south of Spalding ,was aimed principally at finding deposits of oxide and carbonate ores similar to those mined historically at...-
Document
-
Washpool. First partial surrender report, for the period 10/1/2009 to 9/11/2012.
Exploration for copper mineralisation within a now relinquished licence portion centred 21 km east of Spalding was aimed at finding deposits of oxide and carbonate ores similar to those mined historically at Burra and Kapunda. Work performed was the...-
Document
-
Apoinga. Second partial relinquishment report at licence expiry/renewal, for the period 5/11/2007 to 4/11/2012.
Exploration for copper mineralisation within a now relinquished licence portion centred 10-15 km north-west of Eudunda was aimed at finding deposits of oxide and carbonate ores similar to those mined historically at Burra and Kapunda. Work performed...-
Document
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf and Andamooka Opalfields (the Stuart Shelf Joint Venture Project) . Progress reports to licences' expiry/renewal, for the period 16/1/1981 to 16/6/1986. [ Index Part 1 of 3 ].
The continuation of copper-gold exploration across the Stuart Shelf region, as part of a newly indentured joint venture project involving Western Mining Corp. (WMC) and British Petroleum (BP), has remained based on the acquisition of detailed ground...-
Document