-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 1905
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 1915
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 1917
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Engenina Creek. Second partial surrender report, for the period 6/4/1981 to 23/6/1990.
TARGET: Kimberlitic diatremes; Olympic Dam / Tennant Creek style deposits; stratiform base metal deposits; iron ore; Cretaceous sediment - hosted uranium deposits. EXPLORATION: Regional : aerial magnetic and radiometric surveys, geological mapping,...-
Document
Published: 14 Aug 1990
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Purni 1. Test reports.
Contains results of government consultants' palynological and palaeontological studies of drill cuttings and cores, plus data obtained from DST fluid sample water and gas analyses and from conventional core analyses and source rock analytical...-
Document
-
Burial history of the eastern Officer Basin, South Australia.
Burial history analysis of the structurally complex eastern Officer Basin region was performed using data from petroleum, trona exploration and stratigraphic wells, seismic upholes, coal drillholes and selected seismic sections, to construct isopachs...-
Document
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
Mount Eba. Progress reports and final report to licence expiry/full surrender, for the period 23/2/1978 to 22/2/1979.
In a search for possible buried stratiform base metal deposits of Mount Gunson type in an area surrounding Mount Eba Homestead, Carpentaria undertook a field reconnaissance of surface geological structures, followed by a study of aerial photographs...-
Document
-
Lake Coontayunta. Progress reports and final report to licence full surrender, for the period 4/1/1979 to 18/12/1979.
An exploration licence area covering the projected northerly trending, buried portion of the Precambrian Benagerie Ridge basement was taken up by CRA to explore principally for possible secondary sandstone-hosted uranium mineralisation in Tertiary and...-
Document
Published: 30 Nov 1979
-
William Creek (part of the Stuart Range Joint Venture Project). Progress reports to licence expiry/renewal, for the period 11/8/1977 to 10/8/1979.
Exploration for possible Olympic Dam type mineralisation in an area located 20 km south-west of William Creek has consisted of grid-based ground gravity and magnetic surveys followed by the drilling of a deep diamond exploratory / stratigraphic hole...-
Document
-
Dalhousie Block (exploration) summary and five-year plan.
A summary of Block petroleum prospectivity prepared prior to starting selective low-key exploration during the 1985-1989 licence period. The report gives the rationale for the proposed work programme of 4 wells and 1900 line km of seismic acquisition...-
Document
Published: 01 Jan 1985