RB 60/00064 O'Donoghues Castle copper prospect, Balcanoona Station.
Irregular oxidised orebodies up to about 3 feet thick, containing copper carbonates, quartz, sphaerocobaltite (cobalt carbonate) and wad (hydrated manganese oxide), occupy both shear zones aligned parallel with bedding, and crush zones developed...-
Document
Published: 26 Mar 1965
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
Arkaba Hill (part of the Torrens Project). First partial surrender report, for the period 9/7/2012 to 7/3/2017.
Two adjacent portions of the subject licence, which are centred ~13 km south-southwest of Wilpena Pound National Park, have been surrendered following a downgrading of their perceived prospectivity for possible economic buried sediment-hosted oxide...-
Document
-
Mount Craig (part of the Torrens Project). First partial surrender report, for the period from 20/2/2014 to 7/3/2017.
A small part of the subject licence, which lies ~25 km south of Wilpena Pound National Park, has been surrendered following a downgrading of its perceived prospectivity for possible economic buried sediment-hosted oxide and sulphide base metal...-
Document
-
Mount Norwest. Annual reports and final report to licence full surrender, for the period 19/6/2014 to 14/12/2017.
An area located in the south and central Willouran Ranges, and centred ~45 km south-west of Marree, has been explored for possible buried economic Neoproterozoic stratiform copper mineralisation and inferred MVT, replacement or diapir-related other...-
Document
Published: 24 Jan 1918
-
Mount Caernarvon (part of the Torrens Project). First partial surrender report at licence expiry/renewal, for the period from 17/1/2012 to 16/1/2017.
Four portions of the subject licence, which lies adjacent to and south-west of Wilpena Pound National Park, have been surrendered following a downgrading of their perceived prospectivity for possible economic buried sediment-hosted oxide and sulphide...-
Document
-
Paratoo. Progress reports and final report to licence expiry/full surrender, for the period 24/2/1984 to 23/2/1987.
Rotary percussion drilling (61 vertical holes totalling 2895 m), which was designed to try to delineate possible remnant oxidised copper ore reserves at the Paratoo copper mine, 20 km south-west of Yunta, has defined an Inferred mineral resource of...-
Document
Published: 03 Jul 1987
-
Alberrie Creek (part of the Willouran Ranges Project). Annual reports plus final report to licence full surrender, for the period 9/7/2012 to 22/11/2019.
An area centred ~55 km west of Marree has been explored for possible buried economic stratiform copper and magnesite mineralisation. During the first licence year, no work occurred while Native Title land access negotiations were in progress. During...-
Document
Published: 26 Nov 1919
-
Terowie. Progress reports and final report to licence full surrender, for the period 17/11/1976 to 26/6/1978.
In an area of strongly folded, sericitised and silicified lower Adelaidean sedimentary rocks located km north-east of Terowie, an initial four areas of base metal geochemical anomalism were identified on prior EL 158 by surface sampling and geological...-
Document
-
Mount Norwest (part of the Willouran Ranges Project). Annual reports to licence expiry/cancellation, for the period 8/9/2010 to 7/9/2013.
A search primarily directed at assessing the stratiform copper and magnesite potential of an area centred 50 km south-west of Marree has consisted mainly of office studies comprising the collection and review of open file geoscientific data. Early in...-
Document
-
Mount Norwest (part of the Willouran Ranges Project). First partial surrender report for the period 19/6/2014 to 18/6/2016.
61% of a subsequent licence area located in the southern Willouran Ranges has been surrendered due to its perceived diminished prospectivity for buried economic Neoproterozoic stratiform copper mineralisation and inferred MVT, replacement or...-
Document
-
Willouran Ranges. Progress reports and final report to licence expiry/full surrender, for the period 23/7/1974 to 22/7/1975.
Exploration for possible economic Zambian Copperbelt - type stratabound copper deposits which may have formed within the northern Willouran Ranges has consisted of the acquisition of 1:25,000 scale aerial photographs, the conduct of limited regional...-
Document
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Wheal Motley area. Progress reports to licence surrender for the period 16/7/1970 to 26/3/1971.
Exploration for possible economic stratabound/hydrothermal copper and other base metal deposits in an area located on the northern margin of the Murray Basin, south-west of Yunta, failed to find evidence of diapiric breccia and did not reveal any...-
Document
Published: 20 Jan 1971
-
Mount Lyndhurst. Progress and final reports for the period 4/1/1973 to 3/1/1975.
Exploration for stratabound copper mineralisation in the Mount Lyndhurst area, allied with intensive prospecting of existing Mineral Claims and other historic base metal prospects and reported showings, has demonstrated a favourable geological...-
Document
Published: 02 Jan 1975
-
Finniss Springs. Progress reports for the period 27/5/80 to 26/1/83.
Base metal exploration carried out 70 km west and south-west of Marree, to investigate the potential for Olympic Dam - type mineralisation in concealed pre-Adelaidean rocks, has included geochemical rock chip and water sampling, an aerial radiometric...-
Document
Published: 21 Feb 1983
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document