Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 86/00065 Bopeechee Seismic Survey, operations and processing report.
A high resolution seismic reflection survey was completed by SADME on the SW margin of the Great Artesian Basin near Lake Eyre South. 38.9 line km of data was recorded from 17.9.85 to 14.12.85. Geophysical Service Inc. (Adelaide) were contracted for...-
Document
Published: 01 Sep 1986
-
RB 76/00153 Seismic refraction investigation of the Tallaringa Palaeochannel, August 1976.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
RB 88/00062 Bopeechee geophysical survey. Operations and processing report.
A combined EM, resistivity and seismic refraction survey was carried out in the Great Artesian Basin near Lake Eyre South between 18.9.86 and 8.10.86. 15 vertical electrical soundings, 12 Sirotem traverses (150 readings) and 7 refraction spreads were...-
Document
Published: 01 Aug 1988
-
RB 88/00060 1987 Curdimurka Seismic Survey operations and processing report.
The survey was carried out by SADME on the SW margin of the Great Artesian Basin near Lake Eyre South. 22.9 line km of explosive cord shot data and 5 lines were recorded, each of 4-fold CDP coverage and 2-fold vertical stack. Seismograph Service Ltd...-
Document
Published: 01 Aug 1988
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
PEL 55. Quarterly and annual progress reports for the period 22/3/91 to 31/5/96.
During their initial and only licence term the licensees conducted significant regional geological and geophysical studies (seismic mapping, source rock maturation and burial history profiling, and oil migration/entrapment modelling), acquired 60 line...-
Document
Published: 31 May 1996
-
1981 seismic survey, Rainbow Plains, final report.
AIM:The 1981 Rainbow Plains Seismic Survey semi-detailed programme was designed by the PELs 5 and 6 Birdsville Track Ridge Block partners to further define the Haddon Downs structural feature, which in 1979 had been identified on regional line 79-QAM...-
Document
-
1992 seismic survey, Crater, final report.
AIM: Previous semi-detailed seismic mapping of the licence area by the former PELs 5 and 6 licensees had identified several prospects and leads worthy of follow-up detailed seismic work. 7 new lines of infill seismic totalling 60 line km were...-
Document
-
The Arckaringa Basin Coal Project. Progress reports to licences' respective expiry/full surrender, for the period 12/5/1980 to 2/7/1990.
TARGET: Coal in the Arckaringa Basin. EXPLORATION: Rotary drilling (248 holes totalling 56,498 m, including 59 partly cored holes totalling 3555 m. RESULTS: The Wintinna, East Wintinna, Westfield and Murloocoppie coal deposits were discovered and...-
Document
-
1980 seismic survey, Woolkanie, final report.
AIM:The 1980 Woolkanie Seismic Survey was primarily aimed at detailed gridding over areas of known commercial hydrocarbon accumulation, and more specifically was directed toward locating drilling exploration/appraisal sites on or near existing fields,...-
Document
-
PEL 46. Progress and technical reports for the period September 1990 to April 1992.
PEL 46 was cancelled on 6/4/92 following receipt of a geological evaluation and review of petroleum potential in the region, but no subsequent action on the seismic reprocessing portion of the Year One work commitment for the licence. The withdrawal...-
Document
Published: 06 Apr 1992
-
1980 seismic survey, Koomarinna, final report.
AIM:To define a variety of structures indicated by earlier regional seismic work (the 1976 Pillan Hill and 1979 Peera Peera Seismic Surveys), and establish three possible drilling locations.METHODS: Survey dates: 25/6/80 - 8/11/81. Energy source:...-
Document
-
Pedirka Block. Acreage assessment report.
An assessment of the petroleum potential of the Pedirka farmout area, occasioned by the February 1989 compulsory 25% acreage relinquishment of PELs 5 and 6. Items reviewed include Block geology, farmout arrangements, future commitments, an inventory...-
Document
-
Lake Eyre. Farmout Block reports.
Drilling activities, seismic acquisition and processing parameters, prospect data summaries, and current exploration program status and expenditure versus forecast levels are itemized. Exploration included: Regional Seismic Surveys: - 1964...-
Document