-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-05 - Netley Hill porphyry style Cu-Mo mineral prospect. Project final report.
Remodelling and re-interpretation of the geological and geophysical signatures of the Netley Hill prospect by the EL 3848 Joint Venture has indicated good potential for discovering a large porphyry copper-gold deposit at depth, beneath historical...-
Document
Published: 14 May 1908
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Data release - as updated : Goode Hill. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2002 to 28/8/2015.
Exploration of an area of Neoproterozoic metasedimentary rocks bordering, and in part intruded by, Ordovician plutons of the Anabama felsic intrusive complex, has targeted possible analogues to the Blue Rose copper-gold skarn mineralisation...-
Document
Published: 04 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Monarto (part of the Adelaide Hills Project). First partial surrender report, for the period 23/5/2013 to 22/5/2016.
28 square km, or the whole southern half, of an area centred ~14 km north-west of Murray Bridge has now been relinquished because of a recently assigned competing land usage classification that would make it difficult to do mineral exploration there....-
Document
-
North Well Creek. Annual reports and final report to licence expiry/full surrender, for the period 15/11/1994 to 14/11/1999.
Exploration, initially for rare metal elements, was carried out in the vicinity of diapiric structures intruded by leucogranite in the area between Arkaroola Village and Umberatana Homestead. Work comprising petrography, rock chip sampling, stream...-
Document
Published: 07 Feb 1900
-
Manna Hill (part of the Manna Hill Project). Annual reports plus final report to licence full surrender, for the period 30/8/2010 to 27/8/2015.
An area located immediately south of Manna Hill township and the Barrier Highway was taken up to explore for sediment hosted primary gold deposits similar to those found in the Wadnaminga Goldfield. However, the target Neoproterozoic metasedimentary...-
Document
Published: 09 Nov 1915
-
Data release - as updated : One Tree Hill (part of the Manna Hill Project). Annual reports and final report to licence expiry/full surrender, for the period 5/11/2007 to 4/11/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located between the towns of Yunta and Manna Hill was conducted using low cost remote sensing, geochemical and geophysical...-
Document
Published: 15 Dec 1917
-
Data release - as updated : Benda Range (part of the Manna Hill Project). Annual reports and final report to licence full surrender, for the period 6/5/2008 to 14/12/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located south of Manna Hill township was conducted using low cost remote sensing, geochemical and geophysical methods. The...-
Document
Published: 15 Jan 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Prospect Hill. Annual reports for the period 25/7/2006 to 24/7/2018.
Continued evaluation of possible economic primary tin oxide mineralisation at three known separate occurrences in the Prospect Hill area, lying 20 km north-west of Moolawatana Homestead, has focussed on the untested zone immediately below the known...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912
-
Monarto (part of the Adelaide Hills Project). Final report at licence full surrender, for the period 23/5/2013 to 28/8/2018.
A very small area located ~10 km west of Murray Bridge has been explored for the following: - possible buried shear zone hosted gold mineralisation which may occur in structures spatially and probably temporally associated with Delamerian deformation...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Currency Creek and Langhorne Creek (formerly part of the Fleurieu JV Project, then part of the Adelaide Hills Project). Joint final report to licences' joint full surrender, for the period 4/6/1992 to 18/10/2016.
Two slightly separated areas located in the west-central Kanmantoo Trough geological region have been explored for possible economic buried metalliferous deposits by successive licence owners over an almost 25 year - long tenure. The subject report...-
Document
-
Mount Fitton South. Progress reports to licence expiry for the period 17/6/1968 to 16/6/1969.
Historic mining of mainly secondary copper ores plus some sulphides disseminated in granite and locally concentrated in fissure veins at Mount Fitton South has yielded about 2500 tons of material, but possible extensions of the better lodes remain...-
Document
Published: 05 May 1969
-
Freeling Heights (part of Gunsight Project). Progress and partial surrender reports for the period 7/1/1983 to 6/1/1984.
Evaluation of previous investigations, and geochemical sampling of an Ordovician granite intrusion in the Valley Bore area, particularly for pegmatitic tin-tantalum mineralization, has located only low order anomalous values. Some restricted...-
Document
-
Ketchowla. Progress reports to licence expiry/full surrender, for the period 16/11/1981 to 15/11/1983.
Exploration has been undertaken for possible economic porphyry - style copper-molybdenum (-gold) mineralisation in a magnetically complex area located on the western flank of the Ordovician Bendigo Granite batholith, north of Mongolata. Initial field...-
Document
Published: 06 Sep 1983
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document